background image

SAT102

heat interface unit

8

Replacing or cleaning the DHW priority flow meter turbine

Extract the flow sensor.

Unscrew and remove the cartridge (H).

Remove any impurities present or change the cartridge if necessary.

Screw the cartridge back into position.

Re-position the flow sensor.

When  carrying  out  maintenance  on  the  electrical  part,  for  the
connections follow the diagram on page 8.

After concluding maintenance, proceed with the filling and checking
operations described in the chapter “Commissioning” - see page 4.

If  you  require  any  information  regarding  replacement  components,
please contact Altecnic.

H

Содержание altecnic SATK102

Страница 1: ...SATK102 heat interface unit Installation Operation Maintenance Instructions...

Страница 2: ...e suitable provision for ltering and treating the water before it enters the device in accordance with current legislation Failure to do so may result the HIU becoming damaged or working incorrectly 8...

Страница 3: ...o be removed always disconnect the earth connection after disconnecting the electric supply Check that the earth connection has been made to the highest of standards under current legislation 6 Electr...

Страница 4: ...ntroller 3 Pump SATK1020X SATK1020X HE 4 DHW temperature sensor and strainer 5 Flow temperature pocket probe 6 Energy meter spool piece 7 Plate heat exchanger 8 Flow switch 9 Modulating primary contro...

Страница 5: ...or blocks mobile dividing panels or any masonry walls other than those indicated a preliminary static test must be carried out on the support system Isolation Valves Depending on the speci cation orde...

Страница 6: ...eters and settings depending on the model There are a number of speci c DIP SWITCHES on the controller circuit board the way these are con gured will determine the functions enabled Automatic controll...

Страница 7: ...turned off Domestic water generation Domestic water preheating function The function is enabled by setting dip switch 5 to the ON position During periods when the domestic water cycle is not used if t...

Страница 8: ...ct the probe cable lightly folding the tab C and extracting the connector Unscrew the probe Fit the new probe Re t the connector respecting the only possible way it can be inserted Replacing the valve...

Страница 9: ...if necessary Screw the cartridge back into position Re position the ow sensor When carrying out maintenance on the electrical part for the connections follow the diagram on page 8 After concluding mai...

Страница 10: ...4 5 6 1 2 3 4 5 7 6 L N Electric supply 230 V ac 10 50 Hz 1 DHW temperature probe 2 3 4 5 6 7 DHW flow meter DHW modulating valve actuator Earth Pump Fuse Power Supply 230 V ac X X X X X X X X X X X X...

Страница 11: ...d temperature DHW led on domestic water cycle temperature set point too low increase set point HIU strainer clogged call quali ed personnel to have it serviced exchanger partly clogged call quali ed p...

Страница 12: ...K102 heat interface unit Altecnic Ltd Mustang Drive Stafford Staffordshire ST16 1GW T 44 0 1785 218200 E sales altecnic co uk Registered in England No 2095101 altecnic co uk IOM 069 09 12 16 E O E Not...