7
Instructions for use.
Fitting
1.
Check Pipe Diameter and SDR ratio. Set both LIMIT PLATES
(See Illustration (2) below) to appropriate sizes on all 4
Squeeze-Off Units. The correct orientation is with the required
size pointing towards the BOTTOM BAR
2.
Remove the BOTTOM BAR from the tools. Place the frames
over the pipe to be squeezed, and reposition the BOTTOM
BARS ensuring that the pipe is contained between the
SQUEEZE BAR and the BOTTOM BAR
3.
Wind-down the ‘T-Bar’ until the LIMIT PLATES just come into
contact with the BOTTOM BAR (see illustration (2) below) The
pipe is now in a ‘squeezed off’ condition. Repeat for all units in
use
DO NOT ATTEMPT TO TIGHTEN FURTHER OR DAMAGE TO
THE PIPE AND THE TOOL MAY OCCUR!
Removal
After repairing/working on pipe, relax the threaded ‘T-Bar’ on all
units gradually to allow pipe to recover and medium to flow. When
fully clear of pipe, remove BOTTOM BAR and remove tools from
pipe.
7
(2)
Содержание Squeeze 16 20 25 32 SDR 11
Страница 3: ...3...