FAST-PS-M – User’s Manual
27
3.
Installation
This chapter contains instructions for initial inspection and preparation for use.
3.1
Preparation for use
In order to be operational, the power supply must be connected to an appropriate
AC source. The AC source voltage should be within the power supply specification. Do
not apply power before reading, Section 3.2, 3.3 and 3.4. Table 5 below, describes the
basic setup procedure; follow the instructions in the sequence given to prepare the
power supply for use.
Step
Checklist
Description
1
Initial inspection
Physical inspection of power supply
2
Mounting
Installing the power supply, ensuring proper ventilation
3
AC Input Power Connection
Connect the power supply to the AC source
5
Load connection
Wire size selection, Remote Sensing
4
First switch-on
Switch-on checkout procedure
Table 5:
Installation checklist
3.2
Initial inspection
Prior to shipment this power supply was inspected and found free of mechanical
or electrical defects. Upon unpacking of the power supply, inspect for any damage
which may have occurred in transit.
The inspection should confirm that there is no exterior damage to the power
supply such as broken switch or connectors and that the all panel and display are not
scratched or cracked. Keep all packing material until the inspection has been completed.
If damage is detected, compile the RMA form available to the CAEN ELS web site.
3.3
Mounting
The FAST-PS-M module can be used either as a desktop unit or as a rack-mount
device since the unit form factor is designed to be installed in a standard 19-inch
cabinet.
CAUTION