![C.T.M. HS-928 Скачать руководство пользователя страница 26](http://html1.mh-extra.com/html/c-t-m/hs-928/hs-928_service-manual_3152621026.webp)
24
4-3 Control panel maintenance :
4-4 Panel wiring instructions :
※
Cross tool x 1pcs
※
Straight tool x 1pcs
1.Refer to 3-1 Powering off the battery to power off the scooter.
2.Remove the two lock points on the top cover.
3.Use the straight tool to open the control panel.
1.Refer to 3-1 Powering off the battery to power off the scooter.
2.Refer to 4-3 Control panel maintenance: Open the upper control
panel.
3.Open the upper control panel to check the corresponding
connector.
. Main control cable connector
. Buzzer switch connector
. VR initiator controller connector
. Cyclometer transmission wiring connector
B
A
A
B
C
S
C
D
※
If you have problems with the control panel, please reconnect the main cable connector
first. If the situation does not change, please replace with a new product immediately.
※
The shape and color of different panel connectors differ to prevent improperly connecting
the connectors; please do not modify the connector or circuit, which may cause serious
problems.
※
For issues related to the electrical parts of the scooter, it is recommended to first check
the above connectors to confirm whether they have loosened to cause the abnormality.