5
When you remove the packaging, check that the BTG Modular has not been damaged
during transport. If you have any doubts, do not operate the BTG Modular and
quickly contact your By The Glass distributor for advice and consultation.
Please make sure that the following items are included in the delivery:
- 1x – Modular unit, 2 bottle capacity;
- 1x - User and Maintenance Manual, Warranty and Manufacturer Certification;
- 2x - Dispense cassette;
- 2x - silicone corks;
- 4x - VERSITEC® platinum cured silicone tubes;
- 1x - Steel strip to secure the BTG Modular to the wall;
- 4x – Connection screws;
- 1x - Stainless steel drip tray;
- 1x – short gas hose (to connect a subsequent unit);
- 1x – Gas seal;
- 1x – screwdriver to operate the lock
- 1x – electrical cord
Before installation, make sure to establish the correct positioning, ensure there is a
suitable space for the location of the inert gas cylinder (nitrogen or argon) and that
there contains an earthed electrical socket which complies with the regulations.
1. After unpacking your BTG Modular, place it on a solid desk or holder.
2. Check the stance and correct it if necessary using the proper technique of
adjusting the foot/feet. Max. allowed lean: 2°.
3. Mount the supplied steel strip(s) to the wall using a level. Ensure that the units
always remain with their feet on the ground.
Never leave the packaging contents (plastic bags,
foam polystyrene, nails, etc.) within the reach of
children, since they are a source of potential
danger. Please be eco-friendly and recycle the
packaging components
.
steel mounting strip
580mm
6. Installation (read carefully!)
5. Unpacking