26
EN
7
Commissioning
Check the filter and rinsing water line for correct
installation and leakage.
Turn handwheel (
1
) clockwise until the stop is
reached to carry out a first backwashing.
Close the flushing water outlet.
Open the on-site shut-off valves upstream and
downstream from the backwash filter.
Vent the pipeline via the next connection after the
filter.
The filter is ready for operation.
8
Operation
The filter must be backwashed at the latest when
the max. permissible pressure difference (1.2 bar)
is reached.
We recommend backwashing the filter at least
once a month.
Turn the handwheel (1) counterclockwise to the
upper stop. Close the filter by turning it clockwise.
Set the date for the next backwash on the date
ring (4).
1
2
3
5
4
7
6
Содержание Multipur M DN100
Страница 35: ...35 35 ...