background image

 

for all your filter requirements 

Phone: 01422 377367 

email: [email protected] 

www.prosep.co.uk 

 
 

Prosep Filter Systems Ltd

 

Unit G19, River Bank Way, 
Lowfields Business Park, 
Elland, West Yorkshire 
HX5 9DN 

INSTALLATION & OPERATING INSTRUCTIONS 

 

SIX STAGE REVERSE OSMOSIS UNIT WITH PUMP 

 

RP65139715 

Summary of Contents for RP65139715

Page 1: ...22 377367 email sales prosep co uk www prosep co uk Prosep Filter Systems Ltd Unit G19 River Bank Way Lowfields Business Park Elland West Yorkshire HX5 9DN INSTALLATION OPERATING INSTRUCTIONS SIX STAGE REVERSE OSMOSIS UNIT WITH PUMP RP65139715 ...

Page 2: ... manual before proceeding with the actual installation Pay particular attention to all warnings cautions and notes Failure to do so could result in personal injury or damage to equipment or other property System and installation need to comply with local laws and regulations If you have questions please contact us CONTENTS PAGE DESCRIPTION 3 Checklist 3 Recommended Tools List 4 Product Specificati...

Page 3: ... Prosep Filter Systems Ltd Unit G19 River Bank Way Lowfields Business Park Elland West Yorkshire HX5 9DN RP65139715 Reverse Osmosis Water storage tank with valve Tap assembly TOOLS LIST 1 Drill 2 Drill bits 1 8 1 4 7 16 3 1 2 and 9 16 spanner or adjustable 4 Philips screwdriver 5 Utility knife ...

Page 4: ...FICATION 1st Stage 5 micron sediment filter HTPP DM 05N9 8 Change 6 monthly 2nd Stage Activated granular carbon type GAC GAC 9 Change 6 monthly 3rd Stage Carbon block cartridge type PAC PAC 9 Change 6 monthly 4th Stage Reverse Osmosis membrane 75 GPD 1812 75GPD As needed 2 years 5th Stage Post RO carbon filter AICRO 6 monthly 6th Stage Remineraliser and pH balance unit AIMCRO QC 6 monthly FLOW DIA...

Page 5: ...r the sink to distinguish the cold pipe Do not fit the valve on a bend a join or where there is solder on the copper pipe Attach the clamp around the pipe and tighten the clamp bolt to ensure a water tight seal Do not over tighten the clamp bolt as this may distort the water pipe Firmly push the open end of the red tubing attached to the saddle tapping valve into the collar on the front of the sed...

Page 6: ...urn the tap handle to the closed position and let the refilling process begin This process could take 2 4 hours to complete After the second tank is filled you may enjoy the pure water Check for leaks daily for the first week and periodically thereafter You may notice that the water may be milky coloured during the first week This is caused by air bubbles in the water released from the carbon filt...

Page 7: ...he system and the other hand to turn the wrench clockwise to separate the head from the bowl NOTE IF IT IS TOO TIGHT TO OPEN THE HOUSING YOU MAY TRY TO UNPLUG THE FITTING BETWEEN THE RED TUBING AND THE SYSTEM IN ORDER TO REDUCE THE AIR AND WATER PRESSURE INSIDE THE HOUSING e To change the sediment cartridge and the pre carbon cartridge you need to open the clear and opaque housings remove the used...

Page 8: ...all amount of water in storage tank System just starting up Air pressure in storage tank is low Normally it takes 2 3 hours to fill the tank Low water pressure and or temperature can reduce production rate Add pressure to storage tank The pressure should be 8 10 psi when the tank is empty Slow production Low water pressure Crimps in tubing Clogged pefilters Fouled membrane Make sure tubing is stra...

Reviews: