background image

Summary of Contents for OptiPure BWS1500

Page 1: ......

Page 2: ...tion must conform to all local codes and regulations Equipment layout Take time to visualize the final placement of equipment Hose tubing and electrical connections will be made between the Processor Storage Tank RP Pump Buffer Tank and the distribution plumbing Consider the placement of components in relation to the utilities described below and allow easy access for operation and service For exa...

Page 3: ...rear Float Switch Cable Power 120VAC 2A Emergency Bypass Valve Water Quality Monitor Tank Outlet Valve Storage Tank Storage Tank RP Return Line connection Optimized Water to Equipment connection Sample Port Power Cord P o w e r C o r d Air Breather Feed Water Adapter Repressurization RP Pump Buffer Tank Tank Inlet Divert Valve Tank Float Switch inside tank Blending Valve Controller System Status L...

Page 4: ...ugs from all water connections on bottom of Processor Step 1d Place system components where they are to be located Step 1e Rotate Storage Tank outlet to horizontal position providing for a direct connection to RP Pump Step 1f Select a secure mounting location for Processor with access to the dedicated cold Water Supply Drain 120VAC power outlet v Prep the Components Rotate outlet Remove shroud Rem...

Page 5: ...into the user supplied 1 2 Feed Water Supply Valve Step 3b Attach hose barb adapter with clamp to gray hose and connect to Water Supply Route other end of hose to the Water Processor Feedwater Inlet attach hose barb adapter with clamp and connect v Mount the Processor v Make the Feed Water Connection Use keyholes in bracket Hose barb adapter and clamp included 1 2 Adapter ...

Page 6: ...ject Water Outlet on Processor Step 4b Connect the other end of the black tubing from Reject Water Outlet to an approved Air Gap if used route to the Drain and secure v Make the Drain Connection NOTE If required install an approved air gap optional Optipure Air Gap shown ...

Page 7: ...nnect 3 8 blue tubing to Optimized Water Outlet connection on the Processor Step 5b Route blue tubing to Optimized Water Inlet at Tank Inlet Divert Valve on Storage Tank cut to length and connect v Make the Processor to Storage Tank Connection ...

Page 8: ...n the floor or on a stand not more than 8 above the bottom of the Tank Connect 1 gray hose to Tank Outlet and secure with large clamp Step 6b Cut hose to length and connect other end with clamp to RP Pump Inlet Step 6c Connect 3 4 hose to RP Pump Outlet and secure with clamp Step 6d Connect the other end to Inlet of Buffer Tank and secure with clamp ...

Page 9: ...Outlet to Processor Connection Step 7a Attach hose barb adapter with clamp to gray hose Connect to the Buffer Tank Outlet Step 7b Route gray hose to Storage Tank RP Return Line connection on Processor cut to length and connect with hose barb adapter clamp ...

Page 10: ...to Optimized Water to Equipment connection on Processor The other end will later be connected to the distribution plumbing that supplies equipment DO NOT CONNECT THE LINE TO EQUIPMENT AT THIS TIME Optimized Water Line The Optimized Water Line will be connected later either directly to equipment or to an optional post treatment filter and then to equipment ...

Page 11: ...stall three CTO Q cartridges into QT heads 1 2 3 starting from the left side of the Processor Align arrows insert and turn to lock in place v Install Filter Mineral Addition Cartridges Step 9b Install Mineral Addition Cartridge in 4th position ...

Page 12: ...tep 10b Route the cable through the same opening in the white bracket that the Processor s power cord passes through and then around the front to the control box Step 10c Bring the plug to the Tank Switch Cable connector on the side of the control box Align the key slot on plug with connector on box push in and rotate plug to lock in place Float Switch Cable Connector on side of box Through hole i...

Page 13: ...BWS1500 Simple Install Guide 13 v System Start Up System connections completed ready for start up ...

Page 14: ...ng of the Storage Tank and keep it in place throughout system start up temporarily fasten if necessary Step 11b Ensure the Storage Tank Inlet Divert Valve is in the Down position Step 11c Make certain the Emergency Bypass Valve on the Processor is in the SERVICE position pointed downward v Purge Air Flush System Optimized Water Line ...

Page 15: ...tem Disable Button until you hear a click then release The Inlet Solenoid Valve LED will illuminate Water will begin to flow through the system In approximately 30 seconds the Processor pump will start Allow filters and the membrane to purge air Water will begin flowing to the Drain and water will flow through the blue Optimized Water Line to the Storage Tank System enabled Flashing system disable...

Page 16: ...th open handle in line with valve body Step 13b Disable the system On the Processor Controller press and hold the System Disable Button until the click then release The Tank Full LED should begin flashing red indicating the system is disabled Step 13c While securely holding the 1 2 gray Optimized Water Line over the Storage Tank opening turn the Processor Emergency Bypass Valve to the BYPASS posit...

Page 17: ...INLET Step 13e When the Tank reaches this level turn the Processor Emergency Bypass Valve to the SERVICE position Step 13f Resume normal operation Press and hold the System Disable Button until the click then release The Inlet Solenoid Valve LED on Processor Controller will illuminate green v Rapid Fill the Storage Tank Exit Bypass and enable system ...

Page 18: ...nd free of air Step 14c After flow becomes steady close Buffer Tank Valve This will stop water flow through the gray Optimized Water Line and allow the Buffer Tank to fill When full the RP Pump should turn off Step 14d If the RP Pump does not turn off then the air is not fully purged With the Optimized Water line in place over the Storage Tank opening reopen the Buffer Tank Valve then when flow is...

Page 19: ... water exiting the membrane Enter on the Post Installation Checklist Step 15b Press the IN button This indicates the TDS of the Optimized Water flowing to the Storage Tank Step 15c Adjust the Blending Valve to 80 ppm or to user required TDS Step 15d Make single turn adjustments waiting 30 seconds between until TDS is at desired level Step 15e After 5 minutes re check the TDS IN and make final adju...

Page 20: ......

Reviews: