![BWT AQA smart Скачать руководство пользователя страница 42](http://html1.mh-extra.com/html/bwt/aqa-smart/aqa-smart_installation-and-operating-manual_2836718042.webp)
42
EN
System handover to the operator
If there are temporal delays between the installa-
tion/commissioning and handover to the operator,
a manual regeneration cycle must be carried out.
The operator must be told about the function, opera-
tion and checks of the system. Give the installation
and operating instructions to the operator.
Содержание AQA smart
Страница 25: ...25 25 DE T1 H B T2 A S...
Страница 29: ...29 29 DE...
Страница 53: ...53 53 EN T1 H B T2 A S...