
OPERATION
RMB 1445 11/10
Operation Section 4-43
© 2010 Alamo Group Inc.
OPERA
T
ION
Use adequately sized and rated trailers and
equipment to transport the tractor and implement.
Consult an authorized dealer to determine the proper
equipment required. Using adequately sized chains,
heavy duty straps, cables and/or binders, securely tie
down both the front and rear of the tractor utilizing the
proper tie down locations as specified by the tractor
manufacturer.
OPS-U- 0025
Arrange the chains so that when tightened, the
chains are pulling downward and against
themselves. Carefully tighten the securing chains or
other fasteners using boomers or binders to apply
maximum tension. Use extreme care when
attaching and removing the securing devices as the
extreme tension involved when released has the
potential to inflict serious injury.
While hauling the tractor and implement, make
occasional stops to check that the tractor and
implement have not moved or shifted and that the
securing chains have maintained tension. If during
transport a hard braking, sharp turning, or swerving
action was performed, stop at the next safe location
to inspect the security of the load.
OPS-U- 0026
Содержание RMB 1445
Страница 8: ......
Страница 9: ...Safety Section 1 1 SAFETY SECTION ...
Страница 38: ......
Страница 39: ...Introduction Section 2 1 INTRODUCTION SECTION ...
Страница 43: ...Assembly Section 3 1 ASSEMBLY SECTION ...
Страница 54: ......
Страница 55: ...Operation Section 4 1 OPERATION SECTION ...
Страница 74: ...OPERATION RMB 1445 11 10 Operation Section 4 20 2010 Alamo Group Inc OPERATION 7 MACHINE CONTROLS ...
Страница 79: ...OPERATION RMB 1445 11 10 Operation Section 4 25 2010 Alamo Group Inc OPERATION 8 11 Cutting Sequence ...
Страница 101: ...Maintenance Section 5 1 MAINTENANCE SECTION ...
Страница 110: ...MAINTENANCE RMB 1445 11 10 Maintenance Section 5 10 2010 Alamo Group Inc MAINTENANCE ...
Страница 111: ......
Страница 114: ...RMB 1445 11 10 P N 50068815C Printed U S A RMB 1445 REAR MOUNT BOOM MOWER ...