LUBRICATION
General
Refer to the lubrication diagram and grease daily all the points shown.
1.
Power take-off shaft - The PTO shaft should be regularly examined to ensure that it is in good condition
together with the guards. The universal joints should be greased very sparingly, i.e., one shot a week.
NOTE: Overgreasing a universal joint will blow out the cork or neoprene sealing rings that exclude the dirt from
the needle bearing inside.
2.
The two halves of the plastic guard should be checked daily to ensure that they can spin freely on the
shaft. The nylon slip rings which support the guard on the drive shaft should be lightly greased at weekly
intervals.
3.
The telescoping drive shaft should be similarly separated and grease applied to the internal shaft at
approximately 100 hour intervals.
Содержание RMB 1445
Страница 8: ......
Страница 9: ...Safety Section 1 1 SAFETY SECTION ...
Страница 38: ......
Страница 39: ...Introduction Section 2 1 INTRODUCTION SECTION ...
Страница 43: ...Assembly Section 3 1 ASSEMBLY SECTION ...
Страница 54: ......
Страница 55: ...Operation Section 4 1 OPERATION SECTION ...
Страница 74: ...OPERATION RMB 1445 11 10 Operation Section 4 20 2010 Alamo Group Inc OPERATION 7 MACHINE CONTROLS ...
Страница 79: ...OPERATION RMB 1445 11 10 Operation Section 4 25 2010 Alamo Group Inc OPERATION 8 11 Cutting Sequence ...
Страница 101: ...Maintenance Section 5 1 MAINTENANCE SECTION ...
Страница 110: ...MAINTENANCE RMB 1445 11 10 Maintenance Section 5 10 2010 Alamo Group Inc MAINTENANCE ...
Страница 111: ......
Страница 114: ...RMB 1445 11 10 P N 50068815C Printed U S A RMB 1445 REAR MOUNT BOOM MOWER ...