
ASSEMBLY
RMB 1445 11/10
Assembly Section 3-7
© 2010 Alamo Group Inc.
ASSEMBL
Y
DRIVELINE ATTACHMENT
Before starting assembly, make certain that all paint, dirt, and grease are removed from gearbox shaft. To ease
assembly apply a light coat of grease to splines and assemble. Do not assemble a driveline without a shield.
Entanglement in rotating shafts can kill.
Measure distance shown between the tractor PTO Shaft and mower pump shaft. The driveline must collapse to
3” less than the measured dimension. It may be necessary to shorten the shaft. See Maintenance Section for
procedures.
NOTE: The dimensions measured may vary on different tractors. If moving the mower to a different tractor,
complete the measurement step again. If it is necessary to shorten the shaft, there must be at least 6” of shaft
overlap in the operating position.
Fit PTO shaft and attach torque chain to prevent the shaft guard from rotating. (Figure Asm-B-0094)
Raise the stand legs into the work position and secure. (Figure Asm-B-0095)
Содержание RMB 1445
Страница 8: ......
Страница 9: ...Safety Section 1 1 SAFETY SECTION ...
Страница 38: ......
Страница 39: ...Introduction Section 2 1 INTRODUCTION SECTION ...
Страница 43: ...Assembly Section 3 1 ASSEMBLY SECTION ...
Страница 54: ......
Страница 55: ...Operation Section 4 1 OPERATION SECTION ...
Страница 74: ...OPERATION RMB 1445 11 10 Operation Section 4 20 2010 Alamo Group Inc OPERATION 7 MACHINE CONTROLS ...
Страница 79: ...OPERATION RMB 1445 11 10 Operation Section 4 25 2010 Alamo Group Inc OPERATION 8 11 Cutting Sequence ...
Страница 101: ...Maintenance Section 5 1 MAINTENANCE SECTION ...
Страница 110: ...MAINTENANCE RMB 1445 11 10 Maintenance Section 5 10 2010 Alamo Group Inc MAINTENANCE ...
Страница 111: ......
Страница 114: ...RMB 1445 11 10 P N 50068815C Printed U S A RMB 1445 REAR MOUNT BOOM MOWER ...