
MAINTENANCE
RMB 1445 11/10
Maintenance Section 5-7
© 2010 Alamo Group Inc.
MAINTENANCE
Hose Warranty
Warranty is limited to replacement of hoses which have failed due to faulty materials of manufacture. Warranty
will not be considered on hoses that have suffered damage by abrasion, cuts or being pinched or trapped while
in work. Neither will a claim be considered where a hose end has been damaged by a blow or where the
threads or unions have been damaged by overtightening.
PTO GEARBOX
The gearbox oil should be changed every working year or at 600 hour intervals, whichever occurs first. On
level ground gearbox should be filled until oil is visibly level with the lip of the filler plug aperture. Do not attempt
to fill by removing the breather as the depth of tapped thread in the casing at this point is insufficient to allow
repeated loosening an tightening of the breather plug.
The gearbox capacity is 1-1/2 pints of Multi-Purpose Gear Oil P/N 00786250.
Содержание RMB 1445
Страница 8: ......
Страница 9: ...Safety Section 1 1 SAFETY SECTION ...
Страница 38: ......
Страница 39: ...Introduction Section 2 1 INTRODUCTION SECTION ...
Страница 43: ...Assembly Section 3 1 ASSEMBLY SECTION ...
Страница 54: ......
Страница 55: ...Operation Section 4 1 OPERATION SECTION ...
Страница 74: ...OPERATION RMB 1445 11 10 Operation Section 4 20 2010 Alamo Group Inc OPERATION 7 MACHINE CONTROLS ...
Страница 79: ...OPERATION RMB 1445 11 10 Operation Section 4 25 2010 Alamo Group Inc OPERATION 8 11 Cutting Sequence ...
Страница 101: ...Maintenance Section 5 1 MAINTENANCE SECTION ...
Страница 110: ...MAINTENANCE RMB 1445 11 10 Maintenance Section 5 10 2010 Alamo Group Inc MAINTENANCE ...
Страница 111: ......
Страница 114: ...RMB 1445 11 10 P N 50068815C Printed U S A RMB 1445 REAR MOUNT BOOM MOWER ...