ASSEMBLY
RMB 1445 11/10
Assembly Section 3-6
© 2010 Alamo Group Inc.
ASSEMBL
Y
TOP LINK ATTACHMENT
1.
Fit the machines top link.(Figure Asm-B-0086)
2.
Raise machine on tractors linkage until the tractor PTO and the machines gearbox stub shaft are approxi-
mately in line. (Figure Asm-B-0087)
NOTE: As lift occurs be aware the machinery may tilt slightly.
The quadrant lever or machine controls must be operated from the tractor seat. During this
operation ensure no one is standing on or between the linkage arm or bars.
3.
Adjust the top link to bring the machines frame vertical. (Figure Asm-B-0088)
4.
Refit the top link nose quadrant pin, fine adjust position using the tractors draft lift.(A) (Figure Asm-B-0089)
5.
Lower tractor linkage control so that machines weight is taken by the yoke.
6.
Fully tighten the stabilizer lower bolts.(C)
Содержание RMB 1445
Страница 8: ......
Страница 9: ...Safety Section 1 1 SAFETY SECTION ...
Страница 38: ......
Страница 39: ...Introduction Section 2 1 INTRODUCTION SECTION ...
Страница 43: ...Assembly Section 3 1 ASSEMBLY SECTION ...
Страница 54: ......
Страница 55: ...Operation Section 4 1 OPERATION SECTION ...
Страница 74: ...OPERATION RMB 1445 11 10 Operation Section 4 20 2010 Alamo Group Inc OPERATION 7 MACHINE CONTROLS ...
Страница 79: ...OPERATION RMB 1445 11 10 Operation Section 4 25 2010 Alamo Group Inc OPERATION 8 11 Cutting Sequence ...
Страница 101: ...Maintenance Section 5 1 MAINTENANCE SECTION ...
Страница 110: ...MAINTENANCE RMB 1445 11 10 Maintenance Section 5 10 2010 Alamo Group Inc MAINTENANCE ...
Страница 111: ......
Страница 114: ...RMB 1445 11 10 P N 50068815C Printed U S A RMB 1445 REAR MOUNT BOOM MOWER ...