
AIM-50™ Installation Manual
−
Double Ceiling Version 5000147 A01 7
Unpacking and Inspection
Carefully unpack the cartons and match the parts received with the parts list enclosed.
Before Reporting Shortages:
1. Be sure you have received the correct number of boxes, cartons, etc., as shown on
the bill of lading.
2. Check the entire shipment against the enclosed packing slip.
3. Items indicated in the column headed “Back Order” are not included in the shipment
and will follow later.
4. Be sure that nothing has been removed from the cartons before they are checked by the
individual in charge.
5. Empty all boxes completely, open all inside containers, and examine all packing material to
ensure small articles are not overlooked.
If a Shortage or Damage Occurs:
1. You, the receiver, not Burton, are responsible for filing any claim(s) with the delivering carrier
within five (5) days after receipt of the shipment.
2. If damage or shortage occurs in transit, the delivering carrier is required by law to make
notation of a shortage or damage. This notation is to be made on the bill of lading.
3. If, in your opinion, there may be concealed damage, an agent from the delivering carrier is
obligated to make an inspection after the goods are unpacked.
4. Do not destroy packing material until after the agent has made out his report.
5. All claims must be made to the carrier, not Burton.
6. Written authorization must be obtained from Burton before merchandise can be returned.
Содержание AIM-50
Страница 2: ......
Страница 22: ...20 AIM 50 Installation Manual Double Ceiling Version 5000147 A01 Double Ceiling Version Plan Ceiling...
Страница 23: ......