Burton AIM-50 Скачать руководство пользователя страница 9

 

AIM-50™ Installation Manual 

 Double Ceiling Version 5000147 A01     7 

 

Unpacking and Inspection 

 
Carefully unpack the cartons and match the parts received with the parts list enclosed.  

 

Before Reporting Shortages: 

 

1.  Be sure you have received the correct number of boxes, cartons, etc., as shown on  

the bill of lading. 

2.  Check the entire shipment against the enclosed packing slip. 
3.  Items indicated in the column headed “Back Order” are not included in the shipment  

and will follow later. 

4.  Be sure that nothing has been removed from the cartons before they are checked by the 

individual in charge. 

5.  Empty all boxes completely, open all inside containers, and examine all packing material to 

ensure small articles are not overlooked. 

 

If a Shortage or Damage Occurs: 

 
1.  You, the receiver, not Burton, are responsible for filing any claim(s) with the delivering carrier 

within five (5) days after receipt of the shipment. 

2.  If damage or shortage occurs in transit, the delivering carrier is required by law to make 

notation of a shortage or damage. This notation is to be made on the bill of lading. 

3.  If, in your opinion, there may be concealed damage, an agent from the delivering carrier is 

obligated to make an inspection after the goods are unpacked. 

4.  Do not destroy packing material until after the agent has made out his report. 
5.  All claims must be made to the carrier, not Burton. 
6.  Written authorization must be obtained from Burton before merchandise can be returned.  
 

 

Содержание AIM-50

Страница 1: ...INSTALLATION MANUAL DOUBLE CEILING VERSION PERFORMANCE RELIABILITY VALUE AIM 50 The Right Light EXAMINATION...

Страница 2: ......

Страница 3: ...ing Version 100 V A52 DC AIM 50 Double Ceiling Version 240 V A53 DC AIM 50 Double Ceiling Version 230 V This product was designed and assembled in the U S A by BURTON MEDICAL PRODUCTS CORP 21100 Lasse...

Страница 4: ...talling the Ceiling Casting 8 Installing the Down Tube 9 Connecting Power 11 Installing Wall Switch 13 Installing the Extender Arms with Spring Arm 14 Mounting the Light Heads 15 Final Testing 17 Adju...

Страница 5: ...nance and further description of the product please refer to the Operation Maintenance manual furnished with the product Please read these installation instructions very carefully and follow the safet...

Страница 6: ...roperly follow installation and preventive maintenance instructions may result in mechanical failure WARNING Before undertaking any work ensure that the branch circuit power is off and secured from ac...

Страница 7: ...roper height of the light should be set by the end user This depends on the ceiling height the height of the examination tables types of procedures and the user s preferences See Figure 1 on page 6 Du...

Страница 8: ...6 AIM 50 Installation Manual Double Ceiling Version 5000147 A01 Range of Motion Figure 1 Range of motion shown for 9 ft ceiling and 16 inch down tube...

Страница 9: ...nside containers and examine all packing material to ensure small articles are not overlooked If a Shortage or Damage Occurs 1 You the receiver not Burton are responsible for filing any claim s with t...

Страница 10: ...he ceiling casting When the ceiling plate is installed the bolts will also hold the junction box If there isn t space for the junction box on top of the support structure another suitable location in...

Страница 11: ...in a triangular pattern See Equipment Anchorage Diagrams on page 19 for details Installing the Down Tube NOTE The down tube is pre cut and pre drilled at the factory and will suite most exam rooms wi...

Страница 12: ...set screw which is a dog point screw Make sure it fully engages the matching hole in the down tube Then fasten the lower setscrew Use Loctite Threadlocker or similar adhesive on the screws to prevent...

Страница 13: ...ws the view looking up toward the ceiling casting Only installation connections are shown For a complete wiring diagram please refer to the Operation Maintenance manual The switches are shown out of p...

Страница 14: ...stallation Manual Double Ceiling Version 5000147 A01 3 Push the bell housing and the lock ring up until it covers the ceiling casting Tighten the two set screws on the lock ring using an Allen key 3 3...

Страница 15: ...ished with the product to a standard junction box per local codes The wires that go to the light fixture are labeled to light fixture 100V 230V 240V versions Install the wall switch per local codes Wa...

Страница 16: ...Unscrew the cross slotted Phillips screw a 2 Remove the plug cap b from one arm 3 Slide the arm onto the shaft of the double transition d 4 Place the washer c on the shaft and install the retaining r...

Страница 17: ...st be properly installed to avoid safety hazard Figure 1 Figure 2 1 Figure 1 above shows the correct orientation of the spring arm to the light head 2 Loosen the brake screw b and remove the protectiv...

Страница 18: ...e groove h See figure 4 Figure 5 8 Rotate the collar c 180 degrees as shown in figure 5 9 Before installing the brake screw b check the attachment of the light head by pulling and rotating it at the s...

Страница 19: ...inside the arm is pre adjusted at the factory If however the light head drifts up or down please refer to the Operation Maintenance manual for guidance on how to adjust it Cutting the Down Tube If sho...

Страница 20: ...the structural engineer who is responsible for the installation must be contacted since adequate static load distribution in the ceiling may have been jeopardized Declaration of Acceptance I hereby c...

Страница 21: ...AIM 50 Installation Manual Double Ceiling Version 5000147 A01 19 Equipment Anchorage Diagrams Double Ceiling Version Overview...

Страница 22: ...20 AIM 50 Installation Manual Double Ceiling Version 5000147 A01 Double Ceiling Version Plan Ceiling...

Страница 23: ......

Страница 24: ...BURTON MEDICAL 21100 Lassen Street Chatsworth CA 91311 USA Phone 800 444 9909 818 701 8700 Fax 800 765 1770 818 701 8725 www burtonmedical com The Right Light...

Отзывы: