
7
Important Product Safety Information
Refractory Ceramic Fiber Product
The Repair Parts list designates parts that contain refractory ceramic fibers
(RCF). RCF has been classified as a possible human carcinogen. When
exposed to temperatures above 1805°F, such as during direct flame contact,
RCF changes into crystalline silica, a known carcinogen. When disturbed as a
result of servicing or repair, these substances become airborne and, if inhaled,
may be hazardous to your health.
AVOID Breathing Fiber Particulates and Dust
Precautionary Measures
:
Do not remove or replace RCF parts or attempt any service or repair work
involving RCF without wearing the following protective gear:
1. A National Institute for Occupational Safety and Health (NIOSH)
approved respirator
2. Long sleeved, loose fitting clothing
3. Gloves
4. Eye Protection
•
Take steps to assure adequate ventilation.
•
Wash all exposed body areas gently with soap and water after contact.
•
Wash work clothes separately from other laundry and rinse washing
machine after use to avoid contaminating other clothes.
•
Discard used RCF components by sealing in an airtight plastic bag. RCF
and crystalline silica are not classified as hazardous wastes in the United
States and Canada.
First Aid Procedures
:
•
If contact with eyes: Flush with water for at least 15 minutes. Seek
immediate medical attention if irritation persists.
•
If contact with skin: Wash affected area gently with soap and water.
Seek immediate medical attention if irritation persists.
•
If breathing difficulty develops: Leave the area and move to a location
with clean fresh air. Seek immediate medical attention if breathing
difficulties persist.
•
Ingestion: Do not induce vomiting. Drink plenty of water. Seek
immediate medical attention.
Содержание V1104H
Страница 10: ...10 SECTION I GENERAL INFORMATION Figure 1 Dimensional Information...
Страница 18: ...18 V11H SECTION ARRANGEMENT Figure 8...
Страница 24: ...24 SECTION III INSTALLATION INSTRUCTIONS Figure 15 Bare Boiler Assembly...
Страница 28: ...28 Figure 20 V11H Series Jacket Assembly Boiler Models V1104H Thru V1112H...
Страница 29: ...29 Figure 21 V11H Series Jacket Assembly Boiler Models V1113H Thru V1123H...
Страница 33: ...33 Figure 28 Minimum Piping Recommendations for V11H Series Tankless Heater Manifolds...
Страница 39: ...39 Figure 32 V11H Series Minimum Piping Recommendation Primary Secondary Water...
Страница 40: ...40 Figure 33 Minimum Piping Details Bypass With Blend Pump...
Страница 42: ...42 Figure 35 Minimum Piping Details Multiple Boiler Application Primary Secondary Piping With Bypass...
Страница 43: ...43 Figure 36 Minimum Piping Details Multiple Boiler Application Parallel Piping With Blend Pump...
Страница 44: ...44 0 Figure 37 Minimum Piping Requirements V11H Series Steam Boilers Gravity Return...
Страница 45: ...45 Figure 38 Typical Steam Piping Arrangement for Boilers with Pumped Condensate Return and Boiler Feed Unit...
Страница 49: ...49 Figure 42a DHW Generation with Tankless Coils Storage Tank and Destratification Pump...
Страница 50: ...50 Figure 42b DHW Generation with Indirect Water Heater...
Страница 51: ...51 Figure 43 Steam Boiler Safety Valve Hook Up Figure 44 Water Boiler Pressure Relief Valve Hook Up...
Страница 69: ...69 Figure 45 V11H Series Jacket Assembly Boiler Models V1104H Thru V1112H...
Страница 71: ...71 Figure 46 V11H Series Jacket Assembly Boiler Models V1113H Thru V1123H...
Страница 73: ...73 Figure 47 Bare Boiler Assembly...
Страница 75: ...75 Figure 47 Bare Boiler Assembly...
Страница 78: ...78...
Страница 79: ...79...
Страница 80: ...80 Burnham Commercial P O Box 3939 Lancaster PA 17604 Revised November 1 2021...