
26
B.
INSTALL FLUE BAFFLES AND COVER
PLATES
into cleanout openings on left side of boiler
as shown in Figure 18.
See Important Product Safety Information on Page
7 of this manual, regarding refractory ceramic
fiber product warning.
Reportez-vous aux Informations importantes sur
la sécurité du produit à la page 7 de ce manuel
concernant l'avertissement concernant les
produits en fibre de céramique réfractaire.
1. Locate the flue baffle carton. Each flue opening
will get two (2) short baffles and three (3) long flue
baffles.
2. Insert the first short flue baffle, wide end first,
directly above the upper 'J' bolt attachment lug, so
that the baffle rests on the pin row directly behind
the lug.
3. Insert the second short flue baffle, narrow end first,
two (2) pin rows down from the first short baffle.
4. Insert the three (3) long flue baffles, continuing
down on every second pin row and alternating
wide and short ends, so that the end result matches
Figure 18.
Figure 18: Flue Cover Plate Attachment
5. Locate the cover plates, carriage bolts, nuts and
washers in the boiler assembly carton(s).
6. Remove insulation from two 3/8″ diameter holes in
flue cover plates using a 3/8″ drill bit which can be
rotated through insulation by hand.
7. Hook flue cover 'J' bolts over attachment lugs.
8. With one hand, hold top 'J' bolt between your index
and middle fingers. With the other hand, hold flue
plate on a slight inward angle, align top hole with
end of 'J' bolt and force it through as far as possible.
Repeat similar process for bottom 'J' bolt.
9. Holding threaded end of top 'J' bolt, pull outward
and at the same time push flue cover plate against
castings. Place one finger across 'J' bolt at base of
flue cover plate hole. Place 5/16″ washer, split lock
washer and brass nut on end of 'J' bolt. Hand tighten
only. Repeat similar process for bottom 'J' bolt.
10. Push upward on bottom edge of flue cover plate to
eliminate sag in hardware. Tighten brass nuts with
a deep socket or wrench until insulation on cover
plate provides an adequate seal to casting. If after
tightening, a gap is still evident where the sections
join, apply silastic along top and bottom edge of
insulation board.
11. Repeat steps 2 through 10 for mounting remaining
flue cover plates.
C.
MOUNT REAR OBSERVATION PORT
COVER
, Refer to Figure 15.
1. Apply a ¼″ bead of Silastic sealant along the groove
on the inside face of the rear observation port cover.
2. Mount the rear observation port cover onto the rear
section (with the word “Top” in the upright position)
using the (4) 5/16″-18 X 1″ cap screws and washers
provided.
D.
INSPECT SEALS
1. A visual inspection should be made of all sealed
joints and repairs made if necessary. A darkened
boiler room with a light source in the combustion
space and canopy will aid this inspection.
E.
INSTALL THE CERAMIC FIBER FIREWALL
PLATES
on the right side of the center sections
starting at the front and working toward the back, see
Figure 15 and 19. Firewall plates are shipped in the
canopy carton, see chart below for quantities required.
Boiler Model
Front
Firewall Plate
Common
Firewall Plate
V1104H & V1105H
1
0
V1106H & V1107H
1
1
V1108H & V1109H
1
2
V1110H & V1111H
1
3
V1112H & V1113H
1
4
V1114H - V1123H
1
5
Содержание V1104H
Страница 10: ...10 SECTION I GENERAL INFORMATION Figure 1 Dimensional Information...
Страница 18: ...18 V11H SECTION ARRANGEMENT Figure 8...
Страница 24: ...24 SECTION III INSTALLATION INSTRUCTIONS Figure 15 Bare Boiler Assembly...
Страница 28: ...28 Figure 20 V11H Series Jacket Assembly Boiler Models V1104H Thru V1112H...
Страница 29: ...29 Figure 21 V11H Series Jacket Assembly Boiler Models V1113H Thru V1123H...
Страница 33: ...33 Figure 28 Minimum Piping Recommendations for V11H Series Tankless Heater Manifolds...
Страница 39: ...39 Figure 32 V11H Series Minimum Piping Recommendation Primary Secondary Water...
Страница 40: ...40 Figure 33 Minimum Piping Details Bypass With Blend Pump...
Страница 42: ...42 Figure 35 Minimum Piping Details Multiple Boiler Application Primary Secondary Piping With Bypass...
Страница 43: ...43 Figure 36 Minimum Piping Details Multiple Boiler Application Parallel Piping With Blend Pump...
Страница 44: ...44 0 Figure 37 Minimum Piping Requirements V11H Series Steam Boilers Gravity Return...
Страница 45: ...45 Figure 38 Typical Steam Piping Arrangement for Boilers with Pumped Condensate Return and Boiler Feed Unit...
Страница 49: ...49 Figure 42a DHW Generation with Tankless Coils Storage Tank and Destratification Pump...
Страница 50: ...50 Figure 42b DHW Generation with Indirect Water Heater...
Страница 51: ...51 Figure 43 Steam Boiler Safety Valve Hook Up Figure 44 Water Boiler Pressure Relief Valve Hook Up...
Страница 69: ...69 Figure 45 V11H Series Jacket Assembly Boiler Models V1104H Thru V1112H...
Страница 71: ...71 Figure 46 V11H Series Jacket Assembly Boiler Models V1113H Thru V1123H...
Страница 73: ...73 Figure 47 Bare Boiler Assembly...
Страница 75: ...75 Figure 47 Bare Boiler Assembly...
Страница 78: ...78...
Страница 79: ...79...
Страница 80: ...80 Burnham Commercial P O Box 3939 Lancaster PA 17604 Revised November 1 2021...