VII. Venting
E. Assembly of CPVC/PVC Vent Systems (continued)
Figure 7.27: Vent Connections and Flue Gas Sample Cap Location
3. Installation of Horizontal Fitting Terminals (Terminal Option A):
a. See Figure 7.28 for proper orientation of twin pipe horizontal terminals. Outer edge of both terminals must be within 10”
from wall surface. (Figure 7.6)
b. If desired, the terminals can be attached to the end of the vent and/or intake pipes with field supplied stainless steel screws
so that they can be later removed for cleaning and inspection. If this is done, drill a clearance hole in the coupling or
elbow and a tap hole in the end of the vent/intake pipes to accept these screws.
c. If these terminals are installed on snorkels, assemble the snorkels as shown in Figure 7.12. Brace the vertical run of
piping on the building exterior as required.
4. Installation of Vertical Fitting Terminals (Terminal Option H):
a. See Figure 7.29
for the proper orientation of twin pipe vertical terminals.
b. The coupling is used to secure the rodent screen to the end of the vent pipe.
c. A 180° bend (or two 90° elbows) are installed on the top of the air intake pipe. If two 90° elbows are used, a rodent screen
can be installed between them (Figure 7.29). If a 180° bend is used, install a rodent screen in the open side of the bend,
using a ring made of PVC pipe. If desired, the termination fittings can be attached to the end of the vent and/or intake
pipes with field supplied stainless steel screws so that they can be later removed for cleaning and inspection. If this is
done, drill a clearance hole in these fittings and a tap hole in the end of the vent/intake pipes to accept these screws.
d. Use roof flashings and storm collars to prevent moisture from entering the building. Seal the roof flashing to the roof
using generally accepted practice for the type of roof on the installation. Apply RTV to seal the storm collars to the vent
and intake pipes.
5.
Installation of IPEX low profile vent terminal (Terminal Option B)
- See Figure 7.30:
a. Cut two holes in wall to accommodate the size PVC pipe being used. The distance between hole centers is 5.6”.
b. Slide both vent and intake air pipes through the holes, and cement them to the base of the vent termination kit using a
primer and cement listed for use with PVC.
c. Fasten the vent base to the wall using the supplied screws and anchors. The anchors require the drilling of a 3/16” hole x
1-3/16” deep. Locate the holes using the vent base as a template.
d. Screw the vent cap to the vent base using the supplied screws.
e. Once the vent termination and pipes are secure seal the wall penetrations from the interior using a weather resistant RTV
sealant.
Содержание K2WTC
Страница 10: ...10 107774 01 9 17 Figure 4 1 Minimum Clearances To Combustible Construction IV Locating the Boiler continued ...
Страница 12: ...12 107774 01 9 17 Figure 5 1 Wall Layout Mounting Hole Location V Mounting The Boiler continued ...
Страница 81: ...81 107774 01 9 17 X Domestic Hot Water Piping continued Figure 10 1 Domestic Hot Water Piping ...
Страница 88: ...88 107774 01 9 17 XI Wiring continued XI Wiring continued ...
Страница 89: ...89 107774 01 9 17 Figure 11 7 Internal Wiring Connections Diagram XI Wiring continued ...
Страница 100: ...100 107774 01 9 17 Lighting and Operating Instructions XII Start Up and Checkout continued ...
Страница 141: ...141 107774 01 9 17 XVI Repair Parts continued ...
Страница 144: ...144 107774 01 9 17 XVI Repair Parts continued ...
Страница 147: ...147 107774 01 9 17 XVI Repair Parts continued ...
Страница 149: ...149 107774 01 9 17 XVI Repair Parts continued ...
Страница 151: ...151 107774 01 9 17 XVI Repair Parts continued 120 121 122 123 124 125 126 127 ...
Страница 158: ...158 107774 01 9 17 SERVICE RECORD DATE SERVICE PERFORMED ...
Страница 159: ...159 107774 01 9 17 SERVICE RECORD DATE SERVICE PERFORMED ...
Страница 160: ...160 107774 01 9 17 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net ...