30
107774-01 - 9/17
Option
9
10
Illustrated in Figure
7.19
7.20
Pipe Penetration
Through Structure
Vent
Roof
Roof
Intake
Roof
Roof
Material
Vent
DuraVent
PolyPro
(Rigid/Flex)
Centrotherm
InnoFlue
SW/Flex
Intake
B Vent/PVC
B Vent/PVC
Nominal Diameter
Vent
3”
3”
Intake
3”
3”
Min B Vent ID
6”
6”
Min Equivalent Vent Length:
Models
135
36”
36”
150
52”
52”
180
52”
52”
Max Equivalent Vent Length (Note 1):
Models
135
135ft
135ft
150
135ft
135ft
180
135ft
135ft
Vent Manufacturer’s PN for Flex
Termination/Components Required
3PPS-VFT
3PPS-BV*
3PPS-FLEX**
IFBK03****
IAWP03B
* Specify size of B vent (e.g. 3PPS-BV6 is for use with 6” B vent)
** Specify length in feet.
**** Specify Flex length and B-vent diameter (e.g. IFBK032506
includes 25ft of flex and used with 6” B vent)
Note 1: Max vent lengths shown also apply to the intake. Flex vent reduces the maximum allowable vent length.
See equivalent lengths for flex vent shown in Table 7.14 and sizing example on next page.
VII. Venting
C. Design Requirements Unique to Vertical Venting Systems (continued)
Table 7.13b: Summary of Vertical “B-Vent Air Chase” Vent Options
(B-Vent Chase MUST Be Sealed)
NOTICE
Vertical venting and combustion air roof penetrations (where applicable) require the use of roof flashing
and storm collar, which are not supplied with the boiler, to prevent moisture from entering the structure.
Содержание K2WTC
Страница 10: ...10 107774 01 9 17 Figure 4 1 Minimum Clearances To Combustible Construction IV Locating the Boiler continued ...
Страница 12: ...12 107774 01 9 17 Figure 5 1 Wall Layout Mounting Hole Location V Mounting The Boiler continued ...
Страница 81: ...81 107774 01 9 17 X Domestic Hot Water Piping continued Figure 10 1 Domestic Hot Water Piping ...
Страница 88: ...88 107774 01 9 17 XI Wiring continued XI Wiring continued ...
Страница 89: ...89 107774 01 9 17 Figure 11 7 Internal Wiring Connections Diagram XI Wiring continued ...
Страница 100: ...100 107774 01 9 17 Lighting and Operating Instructions XII Start Up and Checkout continued ...
Страница 141: ...141 107774 01 9 17 XVI Repair Parts continued ...
Страница 144: ...144 107774 01 9 17 XVI Repair Parts continued ...
Страница 147: ...147 107774 01 9 17 XVI Repair Parts continued ...
Страница 149: ...149 107774 01 9 17 XVI Repair Parts continued ...
Страница 151: ...151 107774 01 9 17 XVI Repair Parts continued 120 121 122 123 124 125 126 127 ...
Страница 158: ...158 107774 01 9 17 SERVICE RECORD DATE SERVICE PERFORMED ...
Страница 159: ...159 107774 01 9 17 SERVICE RECORD DATE SERVICE PERFORMED ...
Страница 160: ...160 107774 01 9 17 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net ...