4
107774-01 - 9/17
FOLLOW ALL INSTRUCTIONS and warnings
printed in this manual and posted on the boiler.
INSPECT THE BOILER ANNUALLY. To keep
your boiler safe and efficient, have a service
technician follow the Service checklist near the
end of this manual.
IF YOU ARE NOT QUALIFIED to install or
service boilers, do not install or service this one.
THE BOILER MAY LEAK WATER at the end of
its useful life. Be sure to protect walls, carpets,
and valuables from water that could leak from the
boiler.
PROTECT YOUR HOME IN FREEZING
WEATHER. A power outage, safety lockout, or
component failure will prevent your boiler from
lighting. In winter, your pipes may freeze and
cause extensive property damage. Do not leave
the heating system unattended during cold
weather unless alarms or other safeguards are in
place to prevent such damage
WARNINGS FOR THE HOMEOWNER
DO NOT BLOCK AIR FLOW into or around the
boiler. Insufficient air may cause the boiler to
produce carbon monoxide or start a fire.
KEEP FLAMMABLE LIQUIDS AWAY from the
boiler, including paint, solvents, and gasoline.
The boiler may ignite the vapors from the liquids
causing explosion or fire.
KEEP CHILDREN AND PETS away from hot
surfaces of the boiler, boiler piping, vent piping
and vent terminals.
CARBON MONOXIDE (CO) is an odorless,
deadly gas that may be introduced into your
home by any malfunctioning fuel-burning product
or vent system failure. Consider installing CO
alarms near bedrooms in all levels of the building
to warn you and your family of potential CO
exposure.
DANGER
• Water temperature over 125°F (52°C)
can cause severe burns instantly or
death from scalds.
• Children, disabled and elderly are at
highest risk of being scalded.
• Feel water before bathing or showering.
• Installation of an ASSE 1017 or ASSE
1070 certified tempering valve is
REQUIRED as part of this boiler’s
installation. Consult Sections X and
XIII for details on valve installation and
temperature adjustment.
Содержание K2WTC
Страница 10: ...10 107774 01 9 17 Figure 4 1 Minimum Clearances To Combustible Construction IV Locating the Boiler continued ...
Страница 12: ...12 107774 01 9 17 Figure 5 1 Wall Layout Mounting Hole Location V Mounting The Boiler continued ...
Страница 81: ...81 107774 01 9 17 X Domestic Hot Water Piping continued Figure 10 1 Domestic Hot Water Piping ...
Страница 88: ...88 107774 01 9 17 XI Wiring continued XI Wiring continued ...
Страница 89: ...89 107774 01 9 17 Figure 11 7 Internal Wiring Connections Diagram XI Wiring continued ...
Страница 100: ...100 107774 01 9 17 Lighting and Operating Instructions XII Start Up and Checkout continued ...
Страница 141: ...141 107774 01 9 17 XVI Repair Parts continued ...
Страница 144: ...144 107774 01 9 17 XVI Repair Parts continued ...
Страница 147: ...147 107774 01 9 17 XVI Repair Parts continued ...
Страница 149: ...149 107774 01 9 17 XVI Repair Parts continued ...
Страница 151: ...151 107774 01 9 17 XVI Repair Parts continued 120 121 122 123 124 125 126 127 ...
Страница 158: ...158 107774 01 9 17 SERVICE RECORD DATE SERVICE PERFORMED ...
Страница 159: ...159 107774 01 9 17 SERVICE RECORD DATE SERVICE PERFORMED ...
Страница 160: ...160 107774 01 9 17 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net ...