
53
107672-03 - 5/18
VII. Venting
F. Assembly of DuraVent PolyPro Vent Systems (continued)
6. Installation of DuraVent PolyPro Horizontal Concentric Vent Terminal (Terminal Option D) -
Install PolyPro Horizontal Concentric Termination Kit #2PPS-HK or #3PPS-HK (Figure 7.39) as follows:
a. At the planned location cut a 4-1/8” round hole for the 2” terminal or a 5-1/8” round hole for the 3” terminal in
the exterior wall. (See Section VII - A of this manual for permitted terminal locations).
b. If desired, the terminal can be shortened. Mark the desired location of the cut on the outer pipe no closer than
2” from the edge of the tab on the interior wall plate. Prior to cutting outer pipe measure dimension ‘A’ of the
inner pipe as shown in Figure 7.38 and maintain this dimension after cutting the outer pipe. All cuts must be
square and de-burred.
c. Attach the exterior wall plate and seal all around with weather resistant RTV.
d. Slide the cap through the exterior wall plate and hole from the outside of the building and orient the
termination so the air intake slots face down. The cap must be installed level or sloped 1/8” per foot away
from the appliance.
e. Seal the termination to the exterior wall plate with weather resistant RTV.
f. Slide the interior wall plate over the termination and attach to the wall from inside the room.
g. Attach the interior wall plate to the termination with the provided hardware.
h. Install gaskets into co-linear adapter.
i. Attach co-linear adapter to horizontal termination and orient so that the side outlet on the adapter is on or
above the horizontal plane.
7. Vertical Installations using PolyPro Vertical Concentric Termination Kit #2PPS-VK or #3PPS-VK (Figure 7.40):
a. Cut a hole in the roof large enough to clear the concentric terminal at the location of the terminal (see Section
VII - A of this manual for permitted terminal locations).
b. Use a roof flashing and storm collar to prevent moisture from entering the building. See Figure 7.40 for the
model number of the flashing to be used depending on the type of roof. Seal the roof flashing to the roof
using generally accepted practice for the type of roof on the installation.
c. Slide the vertical termination into the flashing from above until seated on the flashing.
d. Plumb the termination and mount the support bracket to the structure.
e. Install gaskets into co-linear adapter.
f. Attach co-linear adapter to vertical termination.
Figure 7.38: Cutting Duravent PolyPro Horizontal Concentric Vent Terminal
Содержание K2WT Residential
Страница 11: ...11 107672 03 5 18 Figure 5 1 Wall Layout Mounting Hole Location V Mounting The Boiler continued ...
Страница 78: ...78 107672 03 5 18 Figure 9 6 Piping Method 1 Near Boiler Piping Shaded Boiler Loop IX System Piping continued ...
Страница 86: ...86 107672 03 5 18 Figure 10 5 J3 Field Wiring Figure 10 4 4 20 mA EMS Field Wiring X Wiring continued ...
Страница 88: ...88 107672 03 5 18 X Wiring continued Figure 10 7 Internal Ladder Diagram ...
Страница 89: ...89 107672 03 5 18 PAGE LEFT INTENTIONALLY BLANK ...
Страница 90: ...90 107672 03 5 18 X Wiring continued ...
Страница 91: ...91 107672 03 5 18 Figure 10 8 Internal Wiring Connections Diagram X Wiring continued ...
Страница 93: ...93 107672 03 5 18 Figure 10 9 TACO SR504 or Equivalent Zone Panel Wiring Connection Diagram X Wiring continued ...
Страница 94: ...94 107672 03 5 18 X Wiring continued Figure 10 10 Sage Zone Control Circulator Panel Wiring Connection Diagram ...
Страница 103: ...103 107672 03 5 18 Lighting and Operating Instructions XI Start Up and Checkout continued ...
Страница 148: ...148 107672 03 5 18 XV Service Parts continued ...
Страница 152: ...152 107672 03 5 18 XV Service Parts continued ...
Страница 154: ...154 107672 03 5 18 XV Service Parts continued 85 86 91 95 ...
Страница 163: ...163 107672 03 5 18 ...
Страница 164: ...164 107672 03 5 18 ...
Страница 165: ...165 107672 03 5 18 ...
Страница 166: ...166 107672 03 5 18 ...
Страница 167: ...167 107672 03 5 18 ...
Страница 168: ...168 107672 03 5 18 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net ...