B. Removing an Existing Boiler From a Common Chimney

 

Read this only if the CHG boiler is replacing an existing boiler that is being removed from a common chimney.   

This section does not apply to the installation of a CHG boiler. 

 

In some cases, when an existing boiler is removed from a common chimney, the common venting system may    

be too large for the remaining appliances. At the time of removal of an existing boiler, the following steps shall be  

followed with each appliance remaining connected to the common venting system placed in operation, while the  

other appliances remaining connected to the common venting system are not in operation.
(a)  Seal any unused openings in the common venting system.
(b)  Visually inspect the venting system for proper size and horizontal pitch and determine there is no    

 

blockage or restriction, leakage, corrosion and other deficiencies which could cause an unsafe condition.

(c)  Insofar as practical, close all building doors and windows and all doors between the space in which all the 

appliances remaining connected to the common venting system are located and other spaces of the building.  

Turn on clothes dryers and any appliance not connected to the common venting system. Turn on any exhaust 

fans, such as range hoods and bathroom exhausts, so they will operate at maximum speed. Do not operate a 

summer exhaust fan. Close fireplace dampers.

(d)  Place in operation the appliance being inspected. Follow the lighting instructions. Adjust thermostat so the    

appliance will operate continuously. 

(e)  Test for spillage at the draft hood relief opening after 5 minutes of main burner operation. Use the flame of    

a match or candle, or smoke from a cigarette, cigar, or pipe.

(f)  After it has been determined that each appliance remaining connected to the common venting system  

 

properly vents when tested as outlined above, return doors, windows, exhaust fans, fireplace dampers and    

any other gas-burning appliances to their previous condition of use.

(g)  Any improper operation of the common venting system should be corrected so the installation conforms  

 

with the National Fuel Gas Code, ANSI Z223.1. When re-sizing any portion of the common venting  

system, the common venting system should be re sized to approach the minimum size as determined using    

the appropriate tables in Part 11 of the National Fuel Gas Code, ANSI Z223.1.

warNINg

NEVEr COmmON VENT a Chg bOIlEr wITh OThEr aPPlIaNCEs

CauTION

VENT SySTEMS MADE By BuRNHAM, HEAT FAB, PRoTECH, AND Z-FLEx RELy oN GASkETS 

FoR PRoPER SEALING. WHEN THESE VENT SySTEMS ARE uSED, TAkE THE FoLLoWING 

PRECAuTIoNS:
•   MAkE SuRE THAT GASkET IS IN PoSITIoN AND uNDAMAGED IN THE FEMALE END oF THE  

  PIPE.

•   MAkE SuRE THAT BoTH THE MALE AND FEMALE PIPES ARE FREE oF DAMAGE PRIoR To  

  assEmbly.

C. Vent / Intake System Assembly 

1)  General Assembly Notes:

a)   Where the use of “silicone” is called for in the following instructions, use GE RTV 106 for the vent collar.   Air 

inlet piping sections are sealed with any general-purpose silicone sealant such as  GE RTV102. PVC air  

 

inlet piping sections are connected with PVC cement. 

b)   Longitudinal welded seams should not be placed at the bottom of horizontal sections of exhaust pipe.
c)   Do not drill holes in vent pipe. 
d)   Do not attempt to mix vent components of different vent system manufacturers.
e)   In some cases, there are differences between the vent system installation instructions in this manual and 

those in the vent system manufacturer’s manual. Where such differences exist, this manual takes    

 

precedence over the vent system manufacturer’s manual.

Содержание CHG CHG150

Страница 1: ...ion consult a qualified installer service agency or the gas supplier This boiler requires a special venting system Read these instructions carefully before installing D N A G N I T A R E P O N O I T A L L A T S N I R O F S N O I T C U R T S N I E C I V R E S S E I R E S G H C Y C N E I C I F F E H G I H G N I S N E D N O C R E L I O B R E T A W T O H D E R I F S A G 100343 01 3 06 ...

Страница 2: ...5 VII Condensate Drain Line 20 VIII Gas Piping 22 IX System Piping 23 A General System Piping Precautions 23 B System Design 23 C Standard Piping Installation Requirements 32 D Piping For Special Situations 33 X Wiring 35 XI Start up and Checkout 39 XII Operation 44 XIII Service and Maintenance 49 XIV Troubleshooting 51 XV Parts 55 Appendix A Special Requirements For Side Wall Vented Appliances In...

Страница 3: ...R SHOWN FOR PROPANE MODEL NUMBER ie CHG225LP PERFORMANCE RATINGS ARE THE SAME FOR BOTH FUELS Figure 2 1 General Configuration I Product Description The CHG is an aluminum gas fired condensing boiler designed for use in forced hot water heating systems requiring supply water temperatures of 180 F or less This boiler may be vented vertically or horizontally with combustion air supplied from outdoors...

Страница 4: ...e the boiler to have either the DOE Heating Capacity required for the Alliance or the net rating required for the heating system whichever results in the larger boiler For systems that incorporate other indirect water heaters refer to the indirect water heater manufacturer s instructions for boiler output requirements 5 Make sure that the boiler received is configured for the correct gas natural o...

Страница 5: ... BURNHAM AL29 4C ALTERNATE HEAT FAB SAF T VENT PROTECH FASNSEAL Z FLEX Z VENT III FLEX L STAR 34 VERTICAL OR HORIZONTAL AT LEAST ONE SIDE OPEN COMBUSTIBLE MATERIAL ON A MAXIMUM OF THREE SIDES 1 HORIZONTAL OR VERTICAL WITH OFFSETS ENCLOSED ON ALL FOUR SIDES 2 1 2 VERTICAL WITH NO OFFSETS Figure 4 1 Clearances To Combustible Or Non combustible Material ...

Страница 6: ... 3 Divide the volume of the boiler room by the input in thousands of BTU hr If the result is less than 50 the boiler room is a confined space Example A CHG225 and a water heater are to be installed in a room measuring 6ft 3 in x 7ft with an 8 ft ceiling The water heater has an input of 30000 BTU hr Total input in thousands of BTU hr 225000 BTU hr 30000 BTU hr 1000 255 MBTU hr Volume of room 6 25 f...

Страница 7: ...Confined Space Ventilation Air From Inside Step 2b If the boiler is to be placed in an unconfined space the natural infiltration into the boiler room will provide adequate air for ventilation without additional openings into boiler room ...

Страница 8: ...anned vent and air intake system exactly In addition observe the following guidelines 1 Approved vent systems Use only one of the approved vent systems shown in Table 4 These systems are made of a special stainless steel alloy AL29 4C for protection against corrosive flue gas condensate They are also designed to provide a gas tight seal at all joints and seams so that flue gas does not enter the b...

Страница 9: ...e Terminal Location Observe the following limitations on the vent terminal location also see Figure 6 3 Vent terminals must be at least 1 foot from any door window or gravity inlet into the building Maintain the correct clearance and orientation between the vent and air intake terminals The vent and air intake terminals must be at the same height and their center lines must be between 12 and 36 in...

Страница 10: ... terminal must be at least 7 feet above a public walkway Do not install the vent terminal directly over windows or doors The bottom of the vent terminal must be at least 3 feet above any forced air inlet located within 10 feet A clearance of at least 4 feet horizontally must be maintained between the vent terminal and gas meters electric meters regulators and relief equipment Do not install vent t...

Страница 11: ... ROOF ROOF VENT PIPE SIZE 3 4 AIR INTAKE PIPE SIZE 4 4 MAXIMUM VENT PIPE LENGTH CHG150 49 5 FT N R CHG225 N R 47 FT MAXIMUM INTAKE PIPE LENGTH CHG150 52 FT N R CHG225 N R 52 FT EXHAUST TERMINAL RODENT SCREEN BY VENT SYSTEM MANUFACTURER SAME DIAMETER AS VENT SYSTEM SEE TABLE 6 5 AIR INTAKE TERMINAL 4 180 ELBOW 4 180 ELBOW VENT MATERIAL APPROVED VENT SYSTEM SHOWN IN TABLE 6 5 AIR INTAKE MATERIAL GAL...

Страница 12: ... Figure 6 3a Location of Vent Terminal Relative to Windows Doors Grade Figure 6 3b Location of Vent Terminal Relative to Meters and Forced Air Inlets Figure 6 3c Positioning Vent Terminal Under Overhangs ...

Страница 13: ... least 12 The bottom of the air inlet terminal must be at least 12 above the normal snow accumulation that can be expected on the roof The air intake terminal must be located on the roof and must be no further than 24 horizontally from the exhaust pipe 8 Wall thimbles Wall thimbles are required where the vent pipe passes through combustible walls with less than the required clearance shown in Tabl...

Страница 14: ...ll Thimble 100184 01 3 Double Wall Thimble 8116115 4 Double Wall Thimble 100185 01 Table 6 6 Vent Air Intake Fitting Equivalent Length VENT FITTING EQUIVALENT LENGTH ft 3 90 ELBOW 5 5 3 45 ELBOW 4 0 4 90 ELBOW 8 0 4 45 ELBOW 4 5 Table 6 5a Alternate Vent Systems and Vent Components MANUFACTURER VENT SYSTEM SIZE WALL THIMBLES HORIZONTAL TERMINATION VERTICAL TERMINATION HEAT FAB SAF T VENT EZ SEAL 3...

Страница 15: ...rom a cigarette cigar or pipe f After it has been determined that each appliance remaining connected to the common venting system properly vents when tested as outlined above return doors windows exhaust fans fireplace dampers and any other gas burning appliances to their previous condition of use g Any improper operation of the common venting system should be corrected so the installation conform...

Страница 16: ...ly of Flex L Intl Star 34 Vent System a Star 34 General Notes Do not cut Star 34 vent components Support horizontal piping sections at intervals of 48 or less Vertical venting systems must be supported by at least one Star 34 Fire stop An additional vertical support is required after any offset Orient Star 34 components so that the arrows on the piping labels are in the direction of flue gas flow ...

Страница 17: ...nstallation instructions b Start assembly of the vent system at the boiler Remove the hose clamp shipped on the CHG vent collar Bend the three hose clamp tabs on this collar outward slightly c Clean the exterior of the male end of the first piece of pipe and the inside of the vent collar on the boiler Remove dirt grease and moisture from the surfaces to be sealed Dry surfaces or allow to dry thoro...

Страница 18: ...port An additional vertical support is required after any offset b Connection to Boiler Start assembly of the vent system at the boiler Remove the hose clamp shipped on the CHG vent collar Bend the three hose clamp tabs on this collar outward slightly Cut the male spigot off of the first piece of pipe Fig 6 9 If necessary crimp the cut end of the pipe so that it can be inserted at least 1 into the...

Страница 19: ... a gasket in the female end of the pipe for a proper seal d Align the longitudinal seam of both pipes Insert the male end of the second pipe into the female end of the first pipe until the bead on the male end contacts the flare on the female end e Tighten the locking band with a nut driver f Repeat d and e for the remaining FasNSeal components g Allow the silicone to cure per the silicone manufac...

Страница 20: ...ot use metallic pipe or fittings in the condensate drain line Do not route the drain line through areas that could be damaged by leaking condensate c Some jurisdictions may require that the condensate be neutralized before being disposed of Dispose of condensate in accordance with local codes d Do not route or terminate the condensate drain line in areas subjected to freezing temperatures e If the...

Страница 21: ...ORROSIVE ROUTE CONDENSATE DRAIN LINE IN A MANNER SUCH THAT ANY CONDENSATE LEAKAGE WILL NOT CAUSE PROPERTY DAMAGE SOME JURISDICTIONS MAY REQUIRE THAT CONDENSATE BE NEUTRALIZED PRIOR TO DISPOSAL Figure 6 11 Condensate Piping Arrangement ...

Страница 22: ...pstream of all gas controls Install the factory provided manual shut off valve outside the jacket with a ground joint union as shown The boiler and its gas connection must be leak tested before placing the boiler in operation When doing this the boiler and its individual shut off must be disconnected from the rest of the system during any pressure testing of that system at pressures in excess of 1...

Страница 23: ... 10 kw 34 MBTU PER END SECTION WITH LOAD BASED ON NET CALORIC VALUE THIS EQUATES TO 75 000 BTU HR GROSS CALORIC INPUT FOR CENTER SECTION AND 37 500 BTU HR GROSS CALORIC INPUT FOR AN END SECTION MAXIMUM ALLOWABLE DELTA T BETWEEN SUPPLY AND RETURN DURING OPERATION IS 45 F AT MAXIMUM LOAD AND 63 F AT MINIMUM LOAD THE PRODUCT SHALL AT ALL TIMES BE FILLED WITH CLEAN POTABLE WATER THE ONLY ALLOWABLE ADD...

Страница 24: ...ater connections are smaller than the pipe size called for in column a reduce the pipe size at the indirect water heater connections To size the circulator a Count all fittings in the planned Indirect Water Heater Loop the indirect water heater loop consists of the shaded piping in Figure 8 4b In doing so you will be counting some piping and fittings which are common to the heating system secondar...

Страница 25: ...25 Figure 8 3 Piping Method 1 Heat Indirect Water Heater Figure 8 2 Piping Method 1 Heat Only ...

Страница 26: ...26 Figure 8 4b Piping Method 1 Indirect Water Heater Loop Piping Shaded Figure 8 4a Piping Method 1 Secondary Loop Piping Shaded ...

Страница 27: ...GPM ft HEAD ft CHG150 1 1 4 8 0 3 0 AL26A AL40A ALG40 ALG50 Taco 007 26 CHG150 1 1 4 8 0 3 0 AL26A AL40A ALG40 ALG50 Taco 0010 165 CHG150 1 1 4 8 0 5 0 AL53A AL79A Taco 0010 96 CHG150 1 1 4 10 0 5 0 ALG79 NOTE 1 Taco 0010 38 CHG225 1 1 4 9 0 3 0 AL26A AL40A ALG40 ALG50 Taco 007 90 CHG225 1 1 4 9 0 5 0 AL53A AL79A Taco 0010 97 CHG225 1 1 4 10 0 5 7 ALG79 ALG100 NOTE 2 Taco 0010 60 Note 1 ALG100 or ...

Страница 28: ...l these equivalent lengths and add them to the total length of straight pipe measured in step a The result is the total equivalent length of the primary loop c Using Table 8 5 find the boiler size being installed and select a boiler primary circulator that shows a maximum equivalent length column d in excess of the total equivalent length calculated in Step b 3 Indirect Water Heater Loop Piping If...

Страница 29: ...29 Figure 8 8 Piping Method 2 Heat Only Figure 8 9 Piping Method 2 Heat Indirect Water Heater ...

Страница 30: ...30 Figure 8 10a Piping Method 2 Secondary Loop Piping Bolded Figure 8 10b Piping Method 2 Primary Loop Piping Bolded ...

Страница 31: ...31 Figure 8 10c Piping Method 2 Indirect Water Heater Loop Piping Bolded Figure 8 11 Piping Method 3 Direct Connection of Boiler to Heating System ...

Страница 32: ...ded pipe If the relief valve discharge is not piped to a drain it must terminate at least 6 inches above the floor Do not run relief valve discharge piping through an area that is prone to freezing The termination of the relief valve discharge piping must be in an area where it is not likely to become plugged by debris 2 The fitting in which the gauge relief valve and LWCO are to be mounted must n...

Страница 33: ...ulator zone systems through zones that are not calling for heat 10 Isolation Valves Recommended Isolation valves are useful when the boiler must be drained as they will eliminate having to drain and refill the entire system 11 Drain Valve Required The drain valve is installed on the return tee located in the lower vestibule compartment as shown in Figure 8 2 12 Low Water Cut off Required The low w...

Страница 34: ...34 Figure 8 14 Chiller Piping Figure 8 13 Isolation of the Boiler From Oxygenated Water with A Plate Heat Exchanger ...

Страница 35: ...5 and 6 the boiler will adjust the target space heating set point supply water temperature downwards as the outdoor air temperature increases If used this sensor should be located on the outside of the structure in an area where it will sense the average air temperature around the house Avoid placing this sensor in areas where it may be covered with ice or snow In general locations where the senso...

Страница 36: ...36 Figure 9 1 Wiring Connections Diagram ...

Страница 37: ...37 Figure 9 2 Ladder Diagram ...

Страница 38: ...38 Figure 9 3 Wiring of Isolation Relay for Control of Two Heating Circulators ...

Страница 39: ...tructions before attempting to fire boiler Make sure that the silicone cure time called for in the vent assembly instructions has passed before firing boiler 5 Inspect all line voltage wiring for loose or uninsulated connections 6 Remove the dust cap from the condensate trap Fig 6 11 Add water to the trap until water runs out the condensate drain Reinstall the dust cap NOTE SAFE LIGHTING AND OTHER...

Страница 40: ...40 CHG Series Lighting and Operating Instructions ...

Страница 41: ...n are needed it will be necessary to press the reset button to restart the boiler Once a flame has been established for the first time subsequent calls for burner operation should result in a flame on the first try 9 Inspect the flame visible through the window On high fire the flame should be stable and mostly blue Fig 10 1 No yellow tipping should be present however intermittent flecks of yellow...

Страница 42: ...s been driven to high fire After this happens allow the boiler to operate for approximately 5 minutes before taking combustion readings b To lock the boiler in low fire simultaneously press and hold the Mode button and button until the display flashes L indicating that the boiler has been driven to low fire After this happens allow the boiler to operate for approximately 5 minutes before taking co...

Страница 43: ...the appropriate circulators also start and stop in response to the thermostats 14 As shipped the heating and indirect water heater set point supply temperatures are both set to 180 F If necessary adjust these to the appropriate settings for the type of system to which this boiler is connected See the Operation Section of this manual for information on how to do this 15 Adjust the heating and indir...

Страница 44: ... safety controls including the low water cut off and safety limit are connected into the MCBA The MCBA uses input from all of these controls to either shut down the boiler when an unsafe condition exists or in some cases to correct the problem 2 The display panel has three primary modes of operation These are Standby Mode Displays boiler s current status This is the default operating mode Paramete...

Страница 45: ... boiler supply temperature will exceed 180 F and there is a possibility that the safety temperature limit will open If this happens the boiler will shut down and a b26 error will appear on the display The boiler will resume normal operation without manual intervention when the safety limit closes this behavior is common on conventional boilers Information mode is used to view various temperatures ...

Страница 46: ...46 Figure 11 2 Basic Menu Tree ...

Страница 47: ...ply water target temperature increases For example if the outdoor air temperature is 30 F the set point temperature for the supply water is 140 F 5 An indirect water heater thermostat can be connected between terminals 7 and 8 on the terminal strip When this thermostat closes the central heating circulator will be turned off and the DHW circulator will be turned on 6 An external limit control can ...

Страница 48: ...fan ignition speed setting If the flame fails to prove the control module will attempt to light the burner 4 more times If a flame is still not established the control will lockout e Once the flame stabilization period has ended the MCBA allows the burner to modulate The actual firing rate is dependent upon the measured current and recent differences between the set point temperature and the suppl...

Страница 49: ...o verify they are free from leaks Call the service technician to make repairs if required 3 Required Annual Inspections and Service In addition to the inspections listed above the following shall be performed by a service technician once every year a Test the low water cutoff by pressing the Test button located at its end The yellow light should come on and E12 should flash on the display Push the...

Страница 50: ... remove accumulation of any loose particulate from the pins and heat transfer surfaces Clean the casting pins by flushing with clean water using a standard garden spray nozzle Do not use any cleaning agents or solvents A soft nylon brush may be used in accessible area Remove inspection cover and inspect Condensate collector sump Drain and flush the condense collector and condensate drain as requir...

Страница 51: ...ded Display reads U 125 continuously Fan running Defective AT250 transformer Blown F3 fuse in MCBA see Figure 13 2 for location Replace with 4A slow blow fuse provided Boiler not responding to call for heat Status code on display 0 see Figure 11 1 Boiler is not seeing call for heat Check thermostat or zone wiring for loose connection miswiring or defective thermostat zone control Boiler fires but ...

Страница 52: ...ed b 24 MCBA is reading a return sensor temperature higher than the supply sensor temperature Condition must be present for at least 75s for this error code to appear Flow through boiler reversed Verify correct piping and pump orientation No boiler water flow Verify that system is purged of air and that appropriate valves are open Sensor wiring reversed Supply or return sensor defective b 25 Suppl...

Страница 53: ...ess and check for 24VAC across AT140 transformer E 13 E 14 E 15 E 16 E 17 Internal control failure Reset the control If problem reoccurs replace the MCBA E 18 MCBA supply sensor detected temperatures in excess of 200 F for an extended period of time See possible causes for b18 error Also check safety limit for proper operation E 19 MCBA return sensor detected temperatures in excess of 200 F for an...

Страница 54: ...54 SERVICE RECORD DATE SERVICE PERFORMED ...

Страница 55: ... local Burnham Wholesale distributor Should you require assistance in locating a Burnham distributor in your area or have questions regarding the availability of Burnham products or repair parts please contact Burnham Customer Service at 717 481 8400 or Fax 717 481 8408 ...

Страница 56: ...t Washer 80860635 4 80860635 4 22 Inspection Port Window 100420 01 1 100420 01 1 23 Upper Vestibule Door 100421 01 1 100421 02 1 24 Partition 100422 01 1 100422 02 1 25 10 x 1 2 Truss Hd Screw 100423 01 21 100423 01 21 26 Shutter Bushing for 875 Hole 100424 01 2 100424 01 2 27 Flat Wire Clip Ribbon Cable 100425 01 2 100425 01 2 28 Right Side Panel Assembly 100426 01 1 100426 01 1 29 5 16 ID Cable ...

Страница 57: ...2 x 3 16 Ground Screw 100464 01 1 100464 01 1 68 Control Chassis 100465 01 1 100465 01 1 69 4 X 4 J Box 100466 01 1 100466 01 1 70 4 X 4 J Box Cover Plate 100467 01 1 100467 01 1 71 Resistor Clamp 312 Dia 100468 01 1 100468 01 1 72 Terminal Block 375 c c 9 Pole 100469 01 1 100469 01 1 73 Pressure Switch 100470 01 1 100470 01 1 74 40VA Transformer LWCO Power Supply 100471 01 1 100471 01 1 75A Boile...

Страница 58: ...58 ...

Страница 59: ...59 ...

Страница 60: ...60 ...

Страница 61: ...61 ...

Страница 62: ...0507 01 1 100507 01 1 107 Sight Glass Gasket 5mm 100508 01 2 100508 01 2 109 Ignition Electrode 100509 01 1 100509 01 1 110 Ignition Electrode Gasket 5mm 100510 01 1 100510 01 1 111 Exhaust Pipe Lip Ring Seal 100511 01 1 100511 02 1 112 Burner Hood 100512 01 1 100512 02 1 113 Burner 100513 01 1 100513 02 1 114 Burner Hood Seal 100514 01 1 100514 02 1 115 Burner Air Distributor Plate 100515 01 1 10...

Страница 63: ...63 ...

Страница 64: ...0535 01 1 Not Shown 5mm x 20mm Fast Acting Ceramic Tube 5 Amp Fuse 100536 01 1 100536 01 1 Not Shown 5mm x 20mm Time Delay Glass Tube 4 Amp Fuse 100537 01 1 100537 01 1 Not Shown 1 2 NPT x 3 1 2 Nipple 806600188 1 806600188 NA Not Shown 1 2 NPT 90 Elbow 100539 01 1 100539 01 NA Not Shown Violet Jumper Wire 100540 01 1 100540 01 1 Not Shown X5 Plug 100541 01 1 100541 01 1 Not Shown Outdoor Sensor 1...

Страница 65: ...65 ...

Страница 66: ...66 ...

Страница 67: ...67 ...

Страница 68: ...a product approved air intake must be used Installation shall be in strict compliance with the manufacturer s instructions A copy of the installation instructions shall remain with the appliance or equipment at the completion of the installation d A metal or plastic identification plate shall be mounted at the exterior of the building four feet directly above the location of the vent terminal The ...

Страница 69: ...69 SERVICE RECORD DATE SERVICE PERFORMED ...

Страница 70: ...70 SERVICE RECORD DATE SERVICE PERFORMED ...

Страница 71: ...71 SERVICE RECORD DATE SERVICE PERFORMED ...

Страница 72: ...9EARS IN 3ERVICE 3ERVICE HARGE AS OF 2ETAIL 0RICE O HARGE ...

Отзывы: