12) Test any external limits or other controls in accordance with the manufacturer’s instructions.
13) Verify that the boiler starts and stops in response to calls for heat from the heating thermostat and indirect
water heater thermostat. Make sure that the appropriate circulators also start and stop in response to the
thermostats.
14) As shipped, the heating and indirect water heater set point supply temperatures are both set to 180°F. If
necessary, adjust these to the appropriate settings for the type of system to which this boiler is connected. See
the Operation Section of this manual for information on how to do this.
15) Adjust the heating and indirect water heater thermostats to their final set points.
Содержание CHG CHG150
Страница 25: ...25 Figure 8 3 Piping Method 1 Heat Indirect Water Heater Figure 8 2 Piping Method 1 Heat Only ...
Страница 29: ...29 Figure 8 8 Piping Method 2 Heat Only Figure 8 9 Piping Method 2 Heat Indirect Water Heater ...
Страница 36: ...36 Figure 9 1 Wiring Connections Diagram ...
Страница 37: ...37 Figure 9 2 Ladder Diagram ...
Страница 38: ...38 Figure 9 3 Wiring of Isolation Relay for Control of Two Heating Circulators ...
Страница 40: ...40 CHG Series Lighting and Operating Instructions ...
Страница 46: ...46 Figure 11 2 Basic Menu Tree ...
Страница 54: ...54 SERVICE RECORD DATE SERVICE PERFORMED ...
Страница 58: ...58 ...
Страница 59: ...59 ...
Страница 60: ...60 ...
Страница 61: ...61 ...
Страница 63: ...63 ...
Страница 65: ...65 ...
Страница 66: ...66 ...
Страница 67: ...67 ...
Страница 69: ...69 SERVICE RECORD DATE SERVICE PERFORMED ...
Страница 70: ...70 SERVICE RECORD DATE SERVICE PERFORMED ...
Страница 71: ...71 SERVICE RECORD DATE SERVICE PERFORMED ...
Страница 72: ...9EARS IN 3ERVICE 3ERVICE HARGE AS OF 2ETAIL 0RICE O HARGE ...