xI Start-up and Checkout
Use the following procedure for initial start-up of the boiler:
1) If not already done, flush the system to remove sediment, flux, and traces of boiler additives. This should
be
done with the boiler isolated from the system.
2) Fill the boiler and hydronic system with water meeting the following requirements:
pH between 6.5 and 8.5
Total Solids less than 2500 PPM
Hardness less than 120 PPM (7 Grains/Gallon)
Pressurize the system to at least 12 psi at the boiler
3) Check all new piping for leaks and purge piping sections that are filled with air. See the
National Fuel Gas
Code
for additional information on testing and purging gas lines.
4) Vent system must be complete and free of obstructions before attempting to fire boiler. Make sure that the
silicone cure time called for in the vent assembly instructions has passed before firing boiler.
5) Inspect all line voltage wiring for loose or uninsulated connections.
6) Remove the dust cap from the condensate trap (Fig 6.11). Add water to the trap until water runs out the
condensate drain. Reinstall the dust cap.
NOTE
safE lIghTINg aND OThEr PErfOrmaNCE CrITErIa wErE mET wITh ThE gas
TraIN assEmbly PrOVIDED ON ThE bOIlEr whEN ThE bOIlEr uNDErwENT
ThE TEsT sPECIfIED IN Z21.13.
warNINg
•
IF ANTIFREEZE IS ADDED To THE SySTEM, uSE oNE oF THE FoLLoWING
APPRoVED PRoDuCTS oR THEIR EquIVALENT:
FERNox ALPHI-11
GE-BETZ SENTINEL x500
•
NEVEr aTTEmPT TO fIll a hOT EmPTy bOIlEr.
warNINg
•
NEVER uSE A FLAME To CHECk FoR GAS LEAkS.
•
MAkE SuRE THAT THE AREA ARouND THE BoILER IS CLEAR AND FREE
FRoM CoMBuSTIBLE MATERIALS, GASoLINE AND oTHER FLAMMABLE
VaPOrs aND lIquIDs
Содержание CHG CHG150
Страница 25: ...25 Figure 8 3 Piping Method 1 Heat Indirect Water Heater Figure 8 2 Piping Method 1 Heat Only ...
Страница 29: ...29 Figure 8 8 Piping Method 2 Heat Only Figure 8 9 Piping Method 2 Heat Indirect Water Heater ...
Страница 36: ...36 Figure 9 1 Wiring Connections Diagram ...
Страница 37: ...37 Figure 9 2 Ladder Diagram ...
Страница 38: ...38 Figure 9 3 Wiring of Isolation Relay for Control of Two Heating Circulators ...
Страница 40: ...40 CHG Series Lighting and Operating Instructions ...
Страница 46: ...46 Figure 11 2 Basic Menu Tree ...
Страница 54: ...54 SERVICE RECORD DATE SERVICE PERFORMED ...
Страница 58: ...58 ...
Страница 59: ...59 ...
Страница 60: ...60 ...
Страница 61: ...61 ...
Страница 63: ...63 ...
Страница 65: ...65 ...
Страница 66: ...66 ...
Страница 67: ...67 ...
Страница 69: ...69 SERVICE RECORD DATE SERVICE PERFORMED ...
Страница 70: ...70 SERVICE RECORD DATE SERVICE PERFORMED ...
Страница 71: ...71 SERVICE RECORD DATE SERVICE PERFORMED ...
Страница 72: ...9EARS IN 3ERVICE 3ERVICE HARGE AS OF 2ETAIL 0RICE O HARGE ...