![Buller Enterprises 4824a Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/buller-enterprises/4824a/4824a_additional-installation-operation-and-maintenance-instructions_2829150007.webp)
PANEL PRO
7
16. Place the pump cover onto the coolant tank. Use the cover mount screws at your
discretion. Consider shearing the tank cover so that the coolant level is visible. The
baffled front section is not an indicator of coolant level at the pump.
17. The filter housing is shipped with a filter in its normal position. Stretch the filter
around the outside of the clear tube.
18. Place the filter housing on the drain all the way to the top, and tighten the clamp so
the screw driver fitting is accessible when the unit is in operation.
19. Remove the tape from the half round screen over the drain hole in the drain pan. It
is taped in its normal operating position. This keeps larger chips from the filter
assembly which would rapidly fill otherwise. Most of the chips should be retained in
the drain pan for easy removal.
20. Place the pump and tank on the floor with the large hole positioned under the chip
filter. Adjust the leg glides so that the coolant pump will slide out from under the
filter housing. Consider placing a couple of 2x4s under the tank to keep the bottom
off of the floor.
21. The controller mount bars (shipped in the tool box) are mounted to the front of the
drain pan. Supplied with the controller mount bars are 8 each 6x25 mm socket head
screws. Liberally apply silicone seal under the head of 4 of the 6mm socket head
screws. Loosely install the controller mount arms to the drain pan with these screws.
Attach the SC2B controller to the arms with the remaining 4 6x25mm screws. Line
up the arms and tighten the screws.
22. Attach the X interconnect cable 16 pin Amp connector to the controller. The
controller connector has a keying pin to prevent installation on the Y/Z connector.