PANEL PRO
4
This manual is intended to help with set up and get you started with operation.
Detailed functions and information can be found in the AvCAM help file.
Training
While most of our users are able to learn Panel Pro operation by careful study of the
paper manual and help file, training is available either at your location or ours. For new
machine owners, we can train at your continental U.S. facility for direct expenses
incurred. This is offered on Saturday training dates only. Week day training is
available at extra cost. You are welcome to travel to our facility for no charge training.
Call us if you would like to schedule training 701-255-7640.
SETTING UP THE PANEL PRO
Planning the area:
You should have enough room for access on the front side (the deep side of the drain
pan), left and rear sides.
The computer should be on a table that is located at a
right angle so that the right hand can reach the keypad, and the left hand can
reach the router.
Shop air must be available to the rear of the Panel Pro with enough slack in the hose
for the entire x axis travel.
Nearby running water is highly recommended to wash chips off of hands and finished
parts, and to replenish the coolant. A laundry tub works great for this purpose.
Hardware setup: