![Buller Enterprises 4824a Скачать руководство пользователя страница 47](http://html1.mh-extra.com/html/buller-enterprises/4824a/4824a_additional-installation-operation-and-maintenance-instructions_2829150047.webp)
PANEL PRO
47
turn the motor. The 6mm screw should be tightened with LockTight 242, and left
overnight to set up.
REMOVE Z AXIS ASSY:
Remove router from spindle mount.
Remove 2 832 screws from air valve.
Remove the air supply line from the air valve.
Remove the 2 6mm screws attaching the AC plug.
Remove the 18 6mm screws attaching the Z base plate to the linear bearings and ball
nut.
STORAGE
Make a habit of covering the Panel Pro after use. Keep the ways clean and oiled with
LPS2. For long term storage coat the steel parts with a preservative oil like LPS3.