
1-11
Delivery
Inspecting Internal Components and Cabling
A thorough visual inspection of internal components and cabling should now be carried out
before powering up the server.
CAUTION:
If the inspection indicates an unacceptable safety condition, the condition must be corrected
before powering up the server.
1. Visually check internal cables for damage.
2. Visually check system components for damage.
3. Manually check internal cable connections.
4. Visually check external power cables for damage.
Note:
If you need to check CSS Module components, refer to the
Maintenance and Service Guide
.
For guidance with cabling, see
Cabling Guide
, 86 A192ER.
Содержание NovaScale 5xx5
Страница 1: ...NovaScale 5xx5 Installation Guide NOVASCALE REFERENCE 86 A1 40EM 06...
Страница 2: ...BLANK...
Страница 8: ...vi Installation Guide Index X 1...
Страница 12: ...x Installation Guide...
Страница 22: ...xx Installation Guide...
Страница 26: ...xxiv Installation Guide...
Страница 105: ...2 55 Setup Procedure...
Страница 116: ...A 10 Installation Guide...
Страница 118: ...B 2 Installation Guide AZERTY QWERTY Keyboard Lookup Table Figure 56 AZERTY keyboard Figure 57 QWERTY keyboard...
Страница 134: ...X 4 Installation Guide...
Страница 137: ...BLANK...
Страница 138: ...BULL CEDOC 357 AVENUE PATTON B P 20845 49008 ANGERS CEDEX 01 FRANCE 86 A1 40EM 06 REFERENCE...
Страница 140: ......