15.7 Maintenance protocol
Please check off the maintenance work as it is completed and record the
measured values.
Follow the instructions on the following pages.
Maintenance work
Page
Date:
Date:
1.
Inspection of the flue system including combustion
air, inlet and outlet openings
page 20
2.
Gas manifold pressure
page 20
page 11
3.
Inspection of burner
page 20
4.
C
leaning of boiler
page 21
5.
C
leaning of burner
page 23
6.
Measuring gas supply pressure
page 16
–––––––inches W.
C
.
–––––––inches W.
C
.
7.
Measuring orifice pressure
page 16
–––––––inches W.
C
.
–––––––inches W.
C
.
8.
C
hecking for leaks in operating condition
page 14
9.
C
hecking pilot burner flame
page 21 ff.
10.
C
hecking main burner flame
page 16
11.
C
heck the vent damper
page 18
12.
C
heck high temperature limit control
page 18
13.
C
heck the area around the boiler for flammable
materials, gasoline or corrosive liquids.
page 15
14.
C
onfirm maintenance
C
onfirmation of correct maintenance
(company stamp, signature)
Table 12 Maintenance protocol