15
Boiler inspection and maintenance
Logano G
C
124 II – 6 720 804 440 (2012/11)
24
▶ Assemble and install the burner in reverse order of removal and
disassembly. (
paragraph „Burner removal“, page 21).
Performing final checks
▶ Place boiler in operation as directed in „Placing the heating system in
operation“ (
chapter 11, page 14).
▶ Follow instructions in „Final start-up procedures“.
▶ Test low water alarm.
▶
C
heck area around boiler for hazards.
C
omplete the maintenance protocol to confirm that all maintenace work
has been conducted. Sign the maintenance protocol and discuss it with
the owner of the heating system.
Be careful not to damage the pilot orifice during
installation and cleaning.
WARNING:
Risk of fire from flammable material or
liquids.
▶ The area around the boiler must be free from
flammable substances, gasoline or any other
flammable or corrosive vapors and liquids.
▶ Maintain a minimum distance of 15 inches around the
boiler.
WARNING:
Risk to life from explosion of flammable
gases.
▶ After maintenance work leaks can occur in pipes and
threaded fastenings.
▶ Make a thorough check for leaks.
▶ Use only approved leak testing agents to search for
leaks.
Содержание Logano GC 124 II
Страница 32: ......