Boiler installation
7
19
We reserve the right to make any changes due to technical modifications.
Installation and maintenance instructions Logano GA124 special gas-fired boiler • Issue 04/2005
2.
Lift the back boiler jacket and remove to the back.
3.
Slide the insertion tabs of the control into the oval
openings.
4.
Slide control toward the boiler front panel.
5.
Push to snap plastic tabs of the control into the
knock-outs.
6.
Remove top cover of control Remove screws from
the top cover.
7.
Fasten control with sheet-metal screws.
8.
Route boiler water sensor cable through the cable
opening and unroll to the required length.
Fig. 12
Removing boiler jacket
Fig. 13
Removing terminal cover
Fig. 14
Installation of Logamatic 2107 control
1