46
Installation and maintenance instructions Logano GA124 special gas-fired boiler • Issue 04/2005
We reserve the right to make any changes due to technical modifications.
Placing the heating system in operation
9
9.6
Start-up protocol
Please check off the start-up work as it is completed and
record the measured values in the table.
Start-up work
Remarks or measured values
1.
Type of gas
Natural gas
Propane
2.
Check combustion air, inlet and outlet openings and
flue gas connection
3.
Check the unit fittings (correct orifices?,
Î
Tab. 14
below) and convert gas type if necessary
4.
Fill boiler with water and bleed complete heating system
5.
Measure gas pressure (supply pressure)
–––––––––––––––––––
inches W. C.
6.
Measure manifold pressure and adjust if necessary
–––––––––––––––––––
inches W. C.
7.
Leak check in operating status, check pilot and main burner flame and
correct functioning of the venting system
8.
Check maximum aquastat
9.
Install front boiler panel
10.
Inform operator, hand over technical documentation
11.
Installer
Operator:
Signature:__________________
Signature:__________________
Main gas orifice identification
Boiler size
17
23
30
Natural gas
265
250
250
Propane gas
175
160
160
Tab. 14 Main gas orifice identification
USER NOTE
z
Inform the customer of the correct fuel
and enter it in the table (
Î
operating
manual of boiler).