18
Installation and maintenance instructions Logano GA124 special gas-fired boiler • Issue 04/2005
We reserve the right to make any changes due to technical modifications.
Boiler installation
7
7.4
Installation of Logamatic 2107 control (optional accessory)
The boiler is fully functional with the factory-installed
aquastat. The Logamatic 2107 control can also be
installed in addition to the factory-installed aquastat.
All Logomatic capillaries and sensors are to be installed
to the boiler immersion well together with the existing
Honeywell aquastat sensor (see page 20 for details)
1.
Unscrew left and right screws in the side panels, lift
front panel up, pull outward and remove to the front.
USER NOTE
Note the following when making electrical
connections:
z
Lay out cables and capillaries carefully.
z
Do not bend the capillaries during
installation.
z
Never carry out any electrical work on
the heating system unless you are
licensed for this type of work. If you are
not a licensed electrician, have a
specialist electrical company make the
electrical connections.
z
Observe the local regulations.
Fig. 11
Removing front panel of boiler