background image

Syncore 

Platform

21

If the UP-key of the time controller is hold until“to 1” appears, 
the equipment starts the program again using the 1st pro-
gram step and the program will repeat indefinitely in a cyclic 
manner. This step can be interrupted by the user by pressing 

the „STOP“-Key.

7.  Checking the program: 
 

Press the „PROGRAM“ button repeatedly and check 
the para meters in all steps of the program. The display 
jumps back to step 1 at the end of the program.

8.  Starting the program: 
 

Pressing once on the „START“ button 

 starts the pro-

gram. The program always starts with the first step, no 
matter what step is shown on the display. 

Comments:

A program cannot be started unless the programming mode 
has been activated (which is shown by the indication of a 
step in the display 

), If only a dot, and no step, appears in  

display field 

, press once on the „PROGRAM“ button to ac-

tivate the program mode. The program can then be started.

The program mode may be aborted any time by pressing 
twice on the „STOP“ button. The temperature and time para-
meters entered previously are stored. A program remains 
stored even after the unit is switched off.

Once the speed for the vortex movement is set, it remains 
constant for all program steps. It can, however, be changed 
manually at any time.

9.   Changing parameters while a program or a step in it is in 

progress: Activate the set-point temperature and/or the 
set-point time as described in steps 2 and 3 and set the 
new set-point temperature and/or set-point time. After 
a delay of 3 seconds, the unit takes over the new set-
point parameters. These new set-point parameters are, 
however, not stored after completion of the program.

10. Ending the program: 
 

A program can be aborted any time by pressing once on 
the „STOP“ button. This stops the temperature control 
for the base plate and/or the heater. 

 

Quit the programming mode by pressing the „STOP“  
twice.

5 Operation

Содержание Syncore

Страница 1: ...Operation Manual Platform Syncore 093008 en...

Страница 2: ......

Страница 3: ...34 6 3 Routine inspection of the equipment annually 35 6 4 Calibration 35 6 5 Error messages Calibration 37 6 6 Replacement of the fuses 37 6 7 Error Messages Hardware 38 6 8 Customer service 38 7 Tak...

Страница 4: ...ck R 6 Analyst 6 Rack R 12 Analy Residual volume of glass tubes 4 1ml 5 0 3ml 6 3ml Glass tube graduation Y Yes N No 1 Power system cable PNE 1 5 m Type CH 10010 Type Schuko 10016 Type GB 17835 Type U...

Страница 5: ...on Manual German 93007 English 93008 French 93009 Italian 93010 Spanish 93011 1P 000 Voltage 1 100V 50 60Hz 2 120V 50 60Hz 3 230V 50 60Hz Condenser 0 None S Type S Standard C Type C Cold trap Round re...

Страница 6: ...yncore Single Platform 100 V 50 60 Hz 38431 Scope of delivery 1 Syncore Single Platform complete Including 1 Adjustment wrench for adjusting eccen 38477 tricity and unbalance compensation 1 Power syst...

Страница 7: ...mage or serious to fatal injuries Warning Information on hazards that can result in injury to one s health or material damage Caution Information pointing out technical requirements A failure to foll...

Страница 8: ...on of samples of from 4 to 96 samples with sample volumes ranging from 500 down to 1 ml Parallel evaporation of from 4 to 96 samples with sample volumes from 1 ml up to 500 ml after chemical synthesis...

Страница 9: ...materials which can form peroxides Very hot or very cold parts made of plastics and metals Burn injuries Kinked hoses or the dissolving of hose materials used to introduce liquids compressed gases un...

Страница 10: ...rouding with the aid of a conventional tool is forbidden The owner of the company is responsible for the instruction of his personnel To assist in this context it is possible to order these Operating...

Страница 11: ...wers A shield protects the operator from contact with hot cold or moving parts The unit is controlled either manually or via a program Up to 9 individual temperature time steps may be programmed each...

Страница 12: ...rong vortex in the sample is produced max speed 600 rpm thereby preventing evaporation retardation The ope rator can adjust the eccentricity of this vortex movement to suit the working volume at hand...

Страница 13: ...ensuring smooth operation even ath high rotational speeds The vacuum cover is designed so that each sample has its own vacuum connection and this combined with baffle eli minates the possibility of cr...

Страница 14: ...ient temperatures between 5 C and 40 C The single platform must be operated from the front There must be open space available for placement of racks or other accessory equipment Take care to install t...

Страница 15: ...ss once on the UP button on the temperature con trol unit The display shifts from the current tempe ra ture to the set point temperature Press the UP button repeatedly to set a new set point for tempe...

Страница 16: ...ooler bracket shackle to the support rod using the cross sleeve Secure the cooler to the shackle Attach the transition piece to the cooler with the clamp Also secure the receiving vessel to the transi...

Страница 17: ...t could happen place the unit in a well ventilated fume cupboard and wait until the fumes have been drawn off completely before operating it Whenever the device is being operated with chemicals that a...

Страница 18: ...around it to vibrate strongly In that case stop the shaking movement and correct the settings The unit must never vibrate so strongly that it can move about on the base on its own or cause laboratory...

Страница 19: ...ing process Press once on the Start button to heat the base plate to the prescribed tem perature A dot in the tempe rature display indicates that the heater is ON The running time display shows how mu...

Страница 20: ...tep 1 The unit will heat the base plate to this temperature and remains constant for the time given 4 Activating the next step Press once on the PROGRAM button to activate the next step in the program...

Страница 21: ...ROGRAM button to ac tivate the program mode The program can then be started The program mode may be aborted any time by pressing twice on the STOP button The temperature and time para meters entered p...

Страница 22: ...d for the motor reducing the power for heating to 70 W For that reason we recommend setting the drive to zero if it is not needed This ensures that the vacuum connection will reach its operating tempe...

Страница 23: ...tion of the unit into fully auto mated systems In such a case the unit is triggered by an external signal A program in the unit can be started with a starting signal Whenever the setting AutoStart of...

Страница 24: ...d make certain that all the sample tubes and the samples dealt with can withstand a temperature higher than 100 C The Crystal Racks were not conceived to be used over a temperature of 100 C Please not...

Страница 25: ...Hysteresis 0 5 C If the control temperature is lower than the actual tempe rature the valve is open Cooling liquid from an external cooling system flows through the cooling plate If the control temper...

Страница 26: ...e determined by the user 5 9 Post program running time of the pro gram controlled valve The setting of the post program running time is achieved by simultaneous pressing of the time UP and DOWN Keys f...

Страница 27: ...is stopped Otherwise the temperature control previously activated is shut off It may be necessary in conjunction with the use of a TTL signal to make a change in a pre set safety setting Refer here a...

Страница 28: ...r speeds of approx 400 RPM are needed for the same sample In addition to this the swirling movement of the liquid in the glass is less effective With an eccentricity of only 1 mm the sample no longer...

Страница 29: ...the operator A narrowing channel on the guide positions the tip of the tool directly on the set screw for eccentricity Insert the tool down to the stop tilted slightly upward and under gentle pressure...

Страница 30: ...e rubber covering of the unit and let the unit run at 60 RPM Holding a felt tip pen against the edge of the heating plate move the pen down until it traces a circle on the paper The radius of the circ...

Страница 31: ...Introduction of the tool for adjusting unbalance Introduce the tool into the opening on the left side of the single platform Introduce the tool down to the stop tilted slightly upward and under gentle...

Страница 32: ...alternating adjustments to and assessments of the settings The unbalance compen sa tion needs to be readjusted The compensation can be fine tuned by watching movable ob jects close to the unit e g loo...

Страница 33: ...es not shake Drive defective Contact B CHI service agent Vacuum cover is not heated The 24 V connection socket has not been connected correctly Check the plug on the vacuum connection Vacuum cover is...

Страница 34: ...uipment monthly General The unit must run quietly without any significant noises from its drive The unit must run without any strong vibrations Rack mount Check the corner brackets and the springs for...

Страница 35: ...tempe ra ture in the heating plate of the Syncore single platform at any time our service agent will be happy to do the calibration for you The calibration takes place automatically controlled by the...

Страница 36: ...e single platform 3 Activate the calibration mode as described above 4 The unit is now run up to the three temperatures 50 C 100 C and 150 C The displayed set point for tempera ture flashes while the...

Страница 37: ...0 C 58 Too much time 150 C was not reached within 20 minutes 59 Correction too large Difference between the internal and external sensors at 150 C 2 C 60 Measurement not stable Temperature is not stab...

Страница 38: ...error START button BUCHI service agent 14 Hardware error START button BUCHI service agent 15 Motor drive BUCHI service agent 16 Temperature sensor channel short circuit BUCHI service agent 17 Temperat...

Страница 39: ...t itself or on its accessories 7 1 Storage Transport Wherever possible the unit and its accessories are to be stored and shipped in the original packages 7 2 Disposal The appendix in chapter 9 contain...

Страница 40: ...Description Order code 1 Adjustment wrench 38477 1 Operation Manual German 93007 English 93008 French 93009 Italian 93010 Spanish 93011 1 Corner bracket kpl 1 pcs 41828 Corner mounts for racks 1 Cover...

Страница 41: ...pm Pre set safety settings Speed Min and max temperature AutoStart Program 9 Steps of up to 9 hours 59 minutes Connections TTL for an external ON OFF signal Valve connection 24 V DC temperature contro...

Страница 42: ...interference at his own expense Fran ais Cet appareil a t test et s est av r conforme aux limites pr vues pour les appareils num riques de classe A et la partie 15 des r glementation FCC la r glementa...

Страница 43: ...Syncore Platform 43 9 Appendix 9 4 Declaration of conformity...

Страница 44: ......

Страница 45: ......

Страница 46: ...B CHI Labortechnik AG CH 9230 Flawil 1 Switzerland T 41 71 394 63 63 F 41 71 394 65 65 www buchi com Quality in your hands...

Отзывы: