Syncore
Platform
16
4 Putting into Operation
Figure 10: Attachment of the condenser unit
4.6 Attachment of the condenser unit S and C
• Screw the right- or left-hand support rod
(depen ding
on the work-place or the working procedure) into the hole
provided in the rear feet.
• Secure the cooler bracket (shackle)
to the support rod
using the cross sleeve
.
• Secure the cooler to the shackle.
• Attach the transition piece
to the cooler with the clamp
.
• Also secure the receiving vessel
to the transition piece
with the clamp
.
• Fasten the cold water supply to the connection units
and
using GL14 screwed fittings.
• Join the connection element
to the valve unit with a
GL 14 sealing cap
.
It is strongly recommend to secure all hose connections by
hose clips.
Figure 11: Cooler connections
Содержание Syncore
Страница 1: ...Operation Manual Platform Syncore 093008 en...
Страница 2: ......
Страница 43: ...Syncore Platform 43 9 Appendix 9 4 Declaration of conformity...
Страница 44: ......
Страница 45: ......