5 | Installation
BÜCHI Labortechnik AG
18/70
Operation Manual Pure Chromatography Instrument C-805
5
Installation
5.1
Installation site
The installation site must meet the following requirements:
The installation site has a firm, level surface.
The installation site meets the specifications according to the technical data (e.g.
weight, dimension, etc.). See Chapter 3.5 "Technical data", page 14
The installation site has no obstacles (e.g. water taps, drains, etc.).
The installation site is not exposed to external thermal loads, such as direct solar
radiation.
The installation site has a own mains outlet socket for the instrument.
The installation site has enough space that cables / tubes can be routed safely.
The installation site allows that the power supply can be disconnected at any time
in an emergency.
The installation site is not exposed to increased electromagnetic emissions.
Electromagnetic fields in the frequency range between 200 to 300 MHz can cause
the instrument to operate incorrectly.
The installation site meets the requirements of the safety data sheets for all sol-
vents and samples used.
5.2
Before installation
NOTICE
Instrument damage due to switching it on too early.
Switching on the instrument too early after transportation can cause damage.
u
Climatize the instrument after transportation.
5.3
Securing against earthquakes
The instrument has an earthquake fixing point to protect the device against falling.
1
Fig. 5: Securing against earthquakes
1
Fixing point
u
Tie the lashing mount to a fixed point using strong cord or a wire.