5 | Installation
Büchi Labortechnik AG
34/88
Operation Manual UniversalExtractor E-800
5.8.2
Connecting inert gas to the extraction glas chamber (option)
u
Attach the inert gas tube onto the connection.
u
Attach the inert gas connection nuts onto the
extraction glas chamber.
u
Connect the inert gas tube.
5.9
Preparing the extraction glass chamber Economic Continuous
Extraction
NOTICE! Make sure that the small gap of
the sealing shows in the direction of the
extraction glass chamber.
u
Attach the sealing to the extraction
glass chamber.
Содержание E-800
Страница 1: ...UniversalExtractor E 800 Operation Manual 11593959 C en ...
Страница 87: ......