register
RSH-EC_Cap_15_en
Rev. 1.0 - 02/2012
35
Insert the voltage supply cable through the holes provided
for that purpose into the junction box. Insert the leads
into the corresponding plug-type connections. Fasten the
leads by means of the slotted screws. Tighten the cable
screw-connection.
Ensure a proper cable screen integration according to EMC: The spring-
loaded contact rails of the screw-connection should make contact to the
cable screen. Adhere to the supplied wiring diagram when carrying out
electrical connection work.
Place the lid onto the junction box and fasten it by
retightening the four screws.
Fig. 15.2
Fix the supplied M12 plug connectors to the ends of the
two bus cables that have preliminarily been connected
to the RSH. For this adhere to the documentation of the
plug connector manufacturer. For details regarding the
connection assignments
refer to chapter E-CAD
PLANS of the customer documentation.
Connect the voltage supply cable coming from the junc-
tion box as well as the bus cables tailored in step 6 to
the register sensor.
(
see chapter 6.4 ELECTRICAL COMMISSIO-
NING/START-UP OF THE REGISTER SENSOR)
Dismantle the optical waveguide(s) from the housing of
the defective
RSH
. Install the optical waveguide(s) into
the
RSH-EC
.(
see chapter 6.3.3 INSTALLING THE
Close all unneeded holes of the junction box by means of dummy
plugs.