background image

BST Solutions GmbH  |  UV COMPACT FLAME DETECTOR IFC 10 

Page 15

4 |  

Transport, installation and  

connection

 

 

4.1  Scope of delivery

• Compact flame detektor IFC 10 
• Operating instructions (optional, customer dependend)
• Connection cable (optional)

Refer to the order papers for the exact scope of delivery and compare with the delivery note.

Checking for completeness
Check the entire delivery for completeness against the accompanying delivery note. Please 
refer to our terms of sale and delivery otherwise.

Report any damage
After arrival of the device and accessories, notify the shipping agent, the insurance company 
and BST Solutions immediately in case of any damage caused by transport or inadequate 
packaging.

Take steps to minimise and prevent further damage.
Report the insurance case to the insurance company without delay and transmit the full 
claim documents at once in order to expedite the claims settlement (at the latest in suf-
ficient time before the expiry of any periods of preclusion and/or limitation relating to the 
compensation claims against third parties).

4.2 Packaging

The compact flame detektor IFC 10 is shipped in different packaging materials.
The most frequently used packaging materials are cardboard and plastics (foils, foamed ma-
terial).

4.3  Shipping instructions

 

All installation and connection work may be carried out by qualified and approved  
specialist staff only!
Observe the legal stipulations and adjustment instructions of the plant operator!

NOTICE

TRANSPORT, INSTALLATION AND CONNECTION

Packaging has to be disposed of in an environmentally friendly way and in accordance 
with the relevant provisions on disposal.

NOTICE

Do not subject the appliance to heavy impacts during transport.  
Do not subject the appliance to any humidity! 

NOTICE

Содержание Flamonitec IFC Series

Страница 1: ...Operating manual UV Compact Flame Detector IFC 10...

Страница 2: ...undamental aspects 2 5 2 Electrical electronic devices 2 5 3 Testing per German Workplace Safety Ordinance BetrSichV 2 5 4 Safety test 3 Technical data 3 1 General characteristic features 3 2 Electric...

Страница 3: ...RMF 1 6 Operation of the compact flame detector IFC 10 6 1 Test of the compact flame detector 6 2 Operating indicator LED 7 Maintenance and servicing 7 1 Cleaning 7 2 Maintenance interval 7 3 Safety r...

Страница 4: ...ion troubleshooting during operation servicing maintenance upkeep inspection repair and or transport This should be confirmed by the operating company in writing 1 2 Warning notes The following warnin...

Страница 5: ...nstructions carefully and in full before operating the compact flame detektor IFC 10 The manufacturer is not liable for damage or operating malfunctions that result from the operating instructions not...

Страница 6: ...compact flame detektor may cause hazards if it is operated inappropriately or in an im proper condition The operating company is under the obligation to operate the machine in proper state only The op...

Страница 7: ...lfunctions that result from operating errors inappropriate repairs or the non observance of the operating instructions We expressly state that only original spare parts and accessories approved by us...

Страница 8: ...r EU Richtlinien entspricht This is to confirm that the below described system in its design and type of construction complies with the provisions of the Directive of the Council of the European Commu...

Страница 9: ...optical interface which visibly indicates the flame signal intensity A simple diagnosis of the flame intensity is directly on the furnace or boiler possible The manufacturer supplier shall not be lia...

Страница 10: ...has been fitted with warning and danger signs for the protection of operating staff These signs have to be observed Damaged or illegible signs have to be replaced immediately NOTICE SAFETY Only operat...

Страница 11: ...aff under the direction and supervision of an electrical specialist The adjustment maintenance and inspection activities and deadlines stipulated by BST Solutions including information on the replacem...

Страница 12: ...s to carry out a precise test prior to start up in accordance with the German Workplace Safety Ordinance BetrSichV in force and the applicable electrical regulations In case of queries please get in t...

Страница 13: ...es life of the UV tube Operating position any position Kind of protection IP 65 Protection class I Humidity max 95 r H non condensing Restart time 5s between controlled shutdown and renewed heat reque...

Страница 14: ...dth 66 mm Height 92 mm Dimensions see under item 4 4 3 5 Block diagram IFC 10 TECHNICAL DATA Applies for the maximum length of cable By an appropriate size depending on the length of cable is to ensur...

Страница 15: ...the insurance company without delay and transmit the full claim documents at once in order to expedite the claims settlement at the latest in suf ficient time before the expiry of any periods of precl...

Страница 16: ...wn At high temperature on the sight glass which could heat the UV tube to about 60 C an air connection is to be provided To avoid interference the direct view is to avoid a spark The maximum cable len...

Страница 17: ...due to high combustion chamber temperatures above 60 C a purge air connection in order to limit the temperature sensor to provide a maximum of 60 C is essential The dimensioning of the scavenging air...

Страница 18: ...g conditions apply to storage Store in a dry place Maximum relative humidity 95 Non condensing In addition it has to be assured that the floor in the storage area will remain dry throughout the storag...

Страница 19: ...rmanently energised With the Dioptric holder which serves also as a connection interface of the flame detector to the combustion chamber the IFC 10 can be fitted with different glasses and lenses to s...

Страница 20: ...st should be repeat for differnt operation situations see also da tasheet This is a essential condition for a safe and proper operation 6 2 Operating indicator LED Via the built in LED the flame detec...

Страница 21: ...ollten folgende Schritte berpr ft werden The attempt to start the burner flame detector is darken after the end of the safety time into lock indicate a fault The attempt to start the burner s flame de...

Страница 22: ...Power off the IFC and take it out of the flange Now clean the glass carefully with a clean and lint free cloth Exchange IFC Exchange tube Ambient light interference I Tube faulty II View to sparks Exc...

Страница 23: ...ctor UV quartz glass plate nut and gasket 465301120200 Adapter 1 with purge air connector UV quartz glass lense nut and gasket 465301220200 Relay module for flame detectors RMF1 230V 640480002000 Rela...

Страница 24: ...BST Solutions GmbH Ruegenstr 7 42579 Heiligenhaus Germany T 49 2056 98947 0 info amonitec bst com www amonitec bst com Subject to technical changes BST Solutions 2021 MEMBER OF MINDERMANN GROUP...

Отзывы: