START-UP CHECKLIST
547K*14 Single Package Rooftop Heat Pump Units
(Remove and use for job file)
I. PRELIMINARY INFORMATION
MODEL NO ____________________________________________
JOB NAME_____________________________________________
SERIAL NO ____________________________________________
ADDRESS _____________________________________________
START-UP DATE________________________________________
TECHNICIAN NAME _____________________________________
ADDITIONAL ACCESSORIES
_____________________________________________________________________________________________________
II. PRE-START-UP
Verify that all packaging materials have been removed from unit
(Y/N) _____
Verify installation of outdoor air hood
(Y/N) _____
Verify that condensate connection is installed per instructions
(Y/N) _____
Verify that all electrical connections and terminals are tight
(Y/N) _____
Check that indoor-air filters are clean and in place
(Y/N) _____
Check that outdoor air inlet screens are in place
(Y/N) _____
Verify that unit is level
(Y/N) _____
Verify that fan assembly is free of obstructions and rotor spins freely
(Y/N) _____
Verify that scroll compressors are rotating in the correct direction
(Y/N) _____
Verify installation of thermostat
(Y/N) _____
III. START-UP
ELECTRICAL
Supply Voltage
L1-L2_____________
L2-L3_____________
L3-L1_____________
Compressor Amps 1
L1 _____________
L2 _____________
L3 _____________
Compressor Amps 2
L1 _____________
L2 _____________
L3 _____________
Supply Fan Amps
L1 _____________
L2 _____________
L3 _____________
Outdoor Fan Amps
L1 _____________
L2 _____________
TEMPERATURES
Outdoor Air Temperature
_____________ °F DB (Dry Bulb)
Return Air Temperature
_____________ °F DB
_____________
°
F WB (Wet Bulb)
Cooling Supply Air Temperature
_____________ °F
NOTE: To avoid injury to personnel and damage to equipment or
property when completing the procedures listed in this start-up
checklist, use good judgment, follow safe practices, and adhere
to the safety considerations/information as outlined in preceding
sections of this Installation Instruction document.
Содержание Legacy 547K 14
Страница 4: ...4 Fig 2 547K 14 Unit Dimensional Drawing...
Страница 5: ...5 Fig 2 547K 14 Unit Dimensional Drawing cont...
Страница 8: ...8 Fig 5 547K 14 Roof Curb Details...
Страница 21: ...21 Fig 41 Typical Control Wiring Diagram Electromechanical with W7220 Controller...
Страница 22: ...22 Fig 42 Typical Power Wiring Diagram 208 230 460 3 60 Unit Shown...
Страница 23: ...23 Fig 43 Typical Power Wiring Diagram 575 3 60 Unit Shown...
Страница 41: ......