35
START--UP CHECKLIST
(Remove and Store in Job Files)
I. PRELIMINARY INFORMATION
MODEL NO.:
SERIAL NO.:
DATE:
TECHNICIAN:
II. PRESTART--UP (Insert check mark in box as each item is completed)
( ) VERIFY THAT ALL PACKING MATERIALS HAVE BEEN REMOVED FROM UNIT
( ) REMOVE ALL SHIPPING HOLD DOWN BOLTS AND BRACKETS PER INSTALLATION INSTRUCTIONS
( ) CHECK ALL ELECTRICAL CONNECTIONS AND TERMINALS FOR TIGHTNESS
( ) CHECK THAT INDOOR (EVAPORATOR) AIR FILTER IS CLEAN AND IN PLACE
( ) VERIFY THAT UNIT INSTALLATION IS LEVEL
( ) CHECK FAN WHEEL, AND PROPELLER FOR LOCATION IN HOUSING/ORIFICE AND SETSCREW TIGHTNESS
III. START--UP
ELECTRICAL
SUPPLY VOLTAGE
COMPRESSOR AMPS
INDOOR (EVAPORATOR) FAN AMPS
TEMPERATURES
OUTDOOR (CONDENSER) AIR TEMPERATURE
DB
RETURN--AIR TEMPERATURE
DB
WB
COOLING SUPPLY AIR
DB
WB
PRESSURES
REFRIGERANT SUCTION
PSIG, SUCTION LINE TEMP*
REFRIGERANT DISCHARGE
PSIG, LIQUID TEMP
{
( ) VERIFY REFRIGERANT CHARGE USING CHARGING CHARTS
* Measured at suction inlet to compressor
{
Measured at liquid line leaving condenser.
707C
--
--
(C
,D
)
Содержание 707C C Series
Страница 3: ...3 A180287 Fig 2 24 36 Unit Dimensions 707C C D...
Страница 4: ...4 Fig 3 42 60 Unit Dimensions 707C C D...
Страница 22: ...22 A150503 Fig 12 Connection Wiring Diagram 208 230 1 60 707C C D...
Страница 23: ...23 A150513 Fig 12 Cont Ladder Wiring Diagram 208 230 1 60 707C C D...
Страница 24: ...24 A150504 Fig 13 Connection Wiring Diagram 208 230 3 60 707C C D...
Страница 25: ...25 A150514 Fig 13 Cont Ladder Wiring Diagram 208 230 3 60 707C C D...
Страница 26: ...26 A150505 Fig 14 Connection Wiring Diagram 460 3 60 707C C D...
Страница 27: ...27 A150515 Fig 14 Cont Ladder Wiring Diagram 460 3 60 707C C D...