39
Technical data
and start-up
PDU254
PROCEDURE STEP
ILLUSTRATION / OTHER INFORMATION
14.
For install output side connections with fuse
protection 20 A, connect the cables with lugs,
serrated lock-washer and tighten the screws (1).
Torque of screws M4 x 8 = 2.5 Nm
15.
Assemble the service cover.
Make sure that the service cap is correctly fitted.
Check the interaction of the actuation surface on
the service cap (1) and the interlock switch (2).
16.
Tighten the screws for the service cap (1).
Torque of screws M6 x 20 = 7.0 Nm
(with serrated lock-washer)