Technical data
and start-up
PDU254
24
6.7
Dimensions and installation information
For the installation of the PDU, the following points must be strictly adhered to:
Despite the IP protection provided, the PDU should be installed in a dry location, protected from splashing
water.
When bringing the device into its installation position, make sure that the connection sides are positioned as
horizontally as possible. This prevents water accumulation on the cable sealings which could result in water
leaking into the housing.
The mechanical fixings must be arranged so that the PDU is fitted firmly and in a way that is as vibration-proof
as possible.
The cable feeds should have sufficient space and must never touch components with sharp edges.
6.7.1
Fixing points
1.
M6 through hole (thread depth 16 mm)
Min. screw-in depth = 10 mm
Torque = 6 Nm
Min screw tension 8.8