2-21
Boat Operation
Section 2
Stopping Procedure
Use the following checklist at the end of each mission
to verify that the appropriate boat systems are config-
ured for a short period of non-use at the dock.
If you are not going to use the boat for a long period of
time, refer to
Off-Season Storage
in Section 6.
❑
Put the engine control lever in NEUTRAL
❑
Secure the boat. Deploy fenders and fender
boards.
❑
Turn the main engine key switch to the OFF
position
❑
Verify that the boat trim tabs are fully retracted
❑
Power down all electronic equipment following
manufacturer’s instructions
❑
Center the outboard engine before tilting to avoid
contact with any special towing equipment
❑
Raise the engine to full Tilt Up position and
engage tilt lock
❑
Turn engine battery OFF-ON switch to OFF posi-
tion
❑
Turn house battery OFF-ON switch to OFF posi-
tion
❑
Remove battery OFF-ON switch knobs, if appro-
priate
❑
Bilge pump has an uninterruptible power supply
to support automatic operation
❑
Verify bilge pump rocker switch is in the AUTO
position
❑
Connect and activate shore power, if appropriate
❑
Verify shore power polarity
!
CAUTION
Keep the bilge pump switch in the AUTO
position anytime the bilge drain plug is in place,
whether the boat is in the water or on a trailer.
Keeping the switch in the AUTO position allows
the system to sense rainwater or melting snow
that might accumulate in the bilge.
Содержание Boston Whaler 21 Guardian Series
Страница 18: ...1 10 Section 1 Safety Deck Occupancy Chart...
Страница 20: ...1 12 Section 1 Safety Warning Label Chart 1 2 3 4 5 6 7 8 9 6 0 A B D G C E F...
Страница 22: ...1 14 Operator Notes...
Страница 52: ...2 30 Operator Notes...
Страница 56: ...3 4 Section 3 Fuel Systems Fuel System Diagram 1 2 5 3 6 7 9 4 8 0 A B C...
Страница 68: ...4 2 Section 4 Boat Systems Control Console Layout 1 2 3 4 5 7 6 8 9 0 B A C E G I D F H J K...
Страница 97: ...5 7 Operator Notes...
Страница 126: ...6 20 Operator Notes...
Страница 128: ...World class support for World class boats...