Checklist in Preparation of the Installation
Site Planning Information BioSpec 70/30 USR_2_V020
89
9
Checklist in Preparation of the
Installation
In order to install the MR instrument in time as planned, the following check list must be
completed in full latest 6 weeks prior to the scheduled installation date and sent, signed, to
your Bruker BioSpin MRI branch.
If the completed check list does not reach the local Bruker BioSpin MRI branch in time,
installation on the scheduled date may be canceled or postponed.
9.1
Customer information
Person responsible for the MR system at the customer site
NAME:
POSITION:
TELEPHONE:
FAX:
EMAIL:
DELIVERY INFORMATIONEN:
DELIVERY ADRESS:
DATE OF DELIVERY:
Содержание BioSpec 70/30 USR V2
Страница 6: ...Contents vi Site Planning Information BioSpec 70 30 USR_2_V020...
Страница 20: ...Safety 20 Site Planning Information BioSpec 70 30 USR_2_V020...
Страница 88: ...Moving or Dismantling the MR Instrument 88 Site Planning Information BioSpec 70 30 USR_2_V020...
Страница 94: ...Checklist in Preparation of the Installation 94 Site Planning Information BioSpec 70 30 USR_2_V020...
Страница 98: ...Tables 98 Site Planning Information BioSpec 70 30 USR_2_V020...
Страница 103: ...Site Planning Information BioSpec 70 30 USR_2_V020 103...
Страница 104: ...Bruker Corporation info bruker com www bruker com Order No Site Planning Information BioSpec 70 30 USR...