
System Set-Up
Global User Manual
2-8
11. Press ‘Machine Start” on the jog box to initiate the
homing sequence.
Starting the GC1 Controller
1. Check machine visually to ensure that all guards and
covers are in place
2. Verify that inlet supply pressure is at least 80 and
120 psi.
3. Turn on the air supply to the CMM and verify that
the pressure gauge reads 58 psi. If the pressure is not
correct, adjust it as outlined in the Pneumatic section of
this manual.
4. Verify that there are no obstacles which could pro-
duce a collision
5. Plug the workstation into a protected power strip.
6. Turn the power strip “ON”.
7. Turn the GC-1 control power switch to the “ON”
position.
8. Power up the computer and log on if necessary.
9. Start the measuring software, if it had not started
automatically.
10. When prompted, check that all emergency stop
buttons are unlatched, then press the MACH. START
button on the jog box.
11.The machine is now ready to start the homing se
quence.
Содержание Global 121510
Страница 2: ......
Страница 6: ......
Страница 8: ......
Страница 16: ...Global General Information Global User Manual 1 10 Floor Plan Global 9XX8 Front View ...
Страница 18: ......
Страница 31: ...System Set Up Global User Manual 2 15 System Set Up Alignment Dots ...
Страница 34: ......
Страница 36: ......
Страница 38: ......
Страница 40: ......
Страница 48: ......
Страница 50: ......
Страница 62: ......
Страница 64: ......
Страница 73: ...System Options Global User Manual 6 11 System Options ...
Страница 76: ......
Страница 78: ......
Страница 83: ...Global Controls Global User Manual 7 7 Controls GC 1 Global Controller and Workstation GC 1 ...
Страница 94: ......
Страница 102: ......
Страница 108: ......
Страница 137: ...Introduction to CMM Global User Manual 10 31 Intro to CMM ...
Страница 138: ......
Страница 144: ......