
Install Bulbs (Ref. No. 30) into heater
assembly.
Place the Top Covers (Ref. No. 9) over edges
of unit with centers overlapping.
Install the Feed Trough (Ref. No. 17) using
1/4”-20 Bolt, 1/4” Washer and 1/4”-20 Whiz
Nut (Ref. Nos. 24, 25 & 26).. Slide bottom of
feeder into rectangle slot next to the drinker,
line up holes and tighten.
Install CD100 Cage Drinker (Ref. No. 28).
See Instructions enclosed in drinker package.
Use pre-existing hole in Feeder Side Panel
(Ref. No. 4).
NOTE: If stacking units it may be easiest to
complete this step along with STEP 12.
STEP 11
For stacking brooders or grow-out pens, remove top 10-24 x 3/4” Bolts (Ref. No. 18) installed in STEP 3 from lower unit
(total of 8). Set upper unit over lower unit, legs on upper unit will overlap bottom units legs. Re-insert fasteners and tighten.
It is not recommended to stack more than four high.
NOTE: This job is best completed with two or more people.
STEP 12
#9 - CQB212 (2x)
#17 - CQB502
#26 - OF335 (3x)
#24 - OF12 (3x)
#28 - CD100
#25 - OF120 (3x)
2
1
A
B
A
B
1
2
2
1
A
B
A
B
1
2
CQB20/CGO20
CQB20/CGO20 (4x)
with CQB600 Caster Base
NOTICE: Shown is CQB20, CGO20 is same without
heater assembly.
2
1
A
B
A
B
1
2