Install Bulbs (Ref. No. 30) into heater 

assembly.

Place the Top Covers (Ref. No. 9) over edges 

of unit with centers overlapping.

Install the Feed Trough (Ref. No. 17) using 

1/4”-20 Bolt, 1/4” Washer and 1/4”-20 Whiz 

Nut (Ref. Nos. 24, 25 & 26)..  Slide bottom of 

feeder into rectangle slot next to the drinker, 

line up holes and tighten.

Install CD100 Cage Drinker (Ref. No. 28). 

See Instructions enclosed in drinker package.  

Use pre-existing hole in Feeder Side Panel 

(Ref. No. 4).

NOTE: If stacking units it may be easiest to 

complete this step along with STEP 12.

STEP 11

For stacking brooders or grow-out pens, remove top 10-24 x 3/4” Bolts (Ref. No. 18) installed in STEP 3 from lower unit 

(total of 8).  Set upper unit over lower unit, legs on upper unit will overlap bottom units legs.  Re-insert fasteners and tighten.  

It is not recommended to stack more than four high.

NOTE: This job is best completed with two or more people.

STEP 12

#9 - CQB212 (2x)

#17 - CQB502

#26 - OF335 (3x)

#24 - OF12 (3x)

#28 - CD100

#25 - OF120 (3x)

2

1

A

B

A

B

1

2

2

1

A

B

A

B

1

2

CQB20/CGO20

CQB20/CGO20 (4x) 
with CQB600 Caster Base

NOTICE: Shown is CQB20, CGO20 is same without 

heater assembly.

2

1

A

B

A

B

1

2

Содержание CQB20

Страница 1: ...Window Channel 6 8 CQB202 Angle Brace 2 9 CQB212 Top Cover 2 10 CQB205 Floor Bracing 3 11 CQB206 Floor Crossing Brace 3 12 CQB215 Floor Screen 1 13 CQB207 Drop Pan 1 14 CQB216 Window Screen 2 15 CQB214 Window Cover 2 16 CQB213 Back Door 1 17 CQB502 Feed Trough 1 CQB20 HDWE CQB20 CGO20 Hardware Bag Contains Ref No 18 26 18 OF44 10 24 x 3 4 Slotted Truss Head Bolt Zinc 8 19 OF214 10 24 x 1 2 Slotted...

Страница 2: ...hten locknuts STEP 2 ASSEMBLY INSTRUCTIONS DO NOT TIGHTEN ANY FASTENERS UNTIL INSTRUCTED TO DO SO CQB20 Brooder has a heater for brooding CGO20 Grow Out Pen is identical to CQB20 except that it has no heater Optional CQB600 Caster Base is designed for either CQB20 or CGO20 WARNING Be sure Power Cord Assembly is not connected during installation or cleaning Remove heater before cleaning Do not touc...

Страница 3: ...units will be identical and that the drinker is always in the front of brooder Use same fastener locations previously indicated Hand tighten fasteners only Install all remaining panels Hand tighten fasteners only Stand Unit upright on four 4 legs Unit may be slightly unstable and may not stay square STEP 3 Attach Floor Bracing Ref No 10 across assembly from one Drop Pan Channel Ref No 6 to the oth...

Страница 4: ...s square as possible NOTE If you have purchased multiple units and plan on stacking them DO NOT tighten the top Bolts Ref No 18 until you reach the stacking instructions in STEP 11 This will save time later STEP 5 Place Floor Cross Bracing Ref No 11 lengthwise on top of Floor Bracing Ref No 10 with the bend at the front end with the form sloping down toward the floor Use Fasteners Ref Nos 22 23 ag...

Страница 5: ... week or so Do not use slick paper such as newspaper or magazine print STEP 7 Install Window Screens and or Window Covers Ref Nos 14 15 in front and side panel Install Door Ref No 16 in back panel NOTE Covers are used to keep more heat inside unit in drafty areas Use the option which will suit your needs best Slide either screen or cover between Window Channels Ref No 7 on the front and side panel...

Страница 6: ...lt 1 4 Washer and 1 4 20 Whiz Nut Ref Nos 24 25 26 STEP 9 CQB20 Only STEP 10 CGO20 Only 24 OF12 2x 28 BRHTR20 RP 26 OF335 2x 25 OF120 2x 2 1 A B Install Cover Plate Ref No 31 using 1 4 20 Bolt 1 4 Washer and 1 4 20 Whiz Nut Ref Nos 24 25 26 24 OF12 2x 31 CGO21 23 OF335 2x 23 OF120 2x 2 1 A B 1 2 NOTICE Image perspective has rotated and floor screen has been removed to show better detail NOTICE Ima...

Страница 7: ... NOTE If stacking units it may be easiest to complete this step along with STEP 12 STEP 11 For stacking brooders or grow out pens remove top 10 24 x 3 4 Bolts Ref No 18 installed in STEP 3 from lower unit total of 8 Set upper unit over lower unit legs on upper unit will overlap bottom units legs Re insert fasteners and tighten It is not recommended to stack more than four high NOTE This job is bes...

Страница 8: ...daily Always keep clean fresh water for the chicks Drop pan should be cleaned daily To facilitate cleaning pans cover them each time with newspaper or litter to absorb odors Your water trough is self cleaning but you may want to periodically disinfect trough Disinfect entire brooder each time chicks are transferred to aid disease control Keep temperatures of the brooder room above 60 degrees F 16 ...

Отзывы: