
Place Angle Brace (Ref. No. 8) under the
top lip of the unit and using Fasteners (Ref.
Nos. 19, 20 & 21). Finger tighten nut from
the underneath side. Note direction of Angle
Brace. This is important for installation of
Heating Unit (Ref. No. 29).
Visually adjust the assembly as close to
square as possible. Start with tightening the
fasteners placed on in STEP 3. This will help
keep the unit in place while tightening the rest.
Start at any corner of the unit and tighten legs
to the panels, making sure at all times that unit
is as square as possible.
NOTE: If you have purchased multiple units,
and plan on stacking them, DO NOT tighten
the top Bolts (Ref. No. 18) until you reach the
stacking instructions in STEP 11. This will
save time later.
STEP 5
Place Floor Cross Bracing (Ref. No. 11)
lengthwise on top of Floor Bracing (Ref. No.
10), with the bend at the front end, with the
form sloping down toward the floor. Use
Fasteners (Ref. Nos. 22 & 23) again placing
nut on the underneath side of the bracing.
Tighten all fasteners.
NOTE: If using CQB600 Caster Base
Assembly, it is recommended to be installed
at this point.
STEP 6
#19 - OF214 (4x)
#20 - OF118 (4x)
#8 - CQB202 (2x)
#21 - OF415 (4x)
BENDS FACE AWAY FROM EACH OTHER
2
1
A
B
A
B
1
2
#23 - OF53 (9x)
#22 - OF3 (9x)
#11 - CQB206 (3x)
#10 - CQB205
2
1
A
B
A
B
1
2