
Slide the Drop Pan (Ref. No. 13) into the
channels from the front of the brooder. Take
the Floor Screen (Ref. No. 12) and slide on
top of the Floor Bracing (Ref. No. 11), also
from the front end of the brooder.
NOTE: For the smallest game birds (such
as various species of quail), we recommend
covering the 1/2” wire mesh floor with paper
towels or cage board for the first week or so.
Do not use slick paper such as newspaper or
magazine print.
STEP 7
Install Window Screens and/or Window
Covers (Ref. Nos. 14 & 15) in front and side
panel. Install Door (Ref. No. 16) in back
panel.
NOTE: Covers are used to keep more heat
inside unit in drafty areas. Use the option
which will suit your needs best. Slide either
screen or cover between Window Channels
(Ref. No. 7) on the front and side panels.
STEP 8
#23 - OF53 (9x)
#22 - OF3 (9x)
#11 - CQB206 (3x)
#10 - CQB205
2
1
A
B
A
B
1
2
#12 - CQB215
#13 - CQB207
2
1
A
B
A
B
1
2
#15 - CQB214
#14 - CQB216 (2x)
#16 - CQB213
#15 - CQB214
2
1
A
B
A
B
1
2
NOTICE: Image perspective has rotated to show better detail.