-43-
EMBROIDERY UNIT ADJUSTMENTS
24.
TIMING BELT TENSION FOR THE X DIRECTION
STANDARD
There should be 4 ± 1 mm slack in the timing belt looped around the X driving shaft and the X tension pulley shaft,
when the center of the belt is pressed by a force of 120g after the X carriage unit is moved all the way to the right.
ADJUSTMENT
1.
Move the X carriage unit all the way to the right.
2.
Loosen the screw of the X tension pulley.(screws (A) and (B))
3.
Adjust the position of the X tension pulley.
4.
Tighten the screw of the X tension pulley.(screws (A) and (B))
Adjustment Point
If the tension in the belt is too weak or too tight, the embroidery may not be aligned correctly (the inside of the
pattern may not align with the outline).
Содержание PC8200 SUPER GALAXIE 2000
Страница 1: ...SERVICE MANUAL FOR COMPUTERIZED SEWING MACHINE PC8200 SUPER GALAXIE 2000 9 1997 ...
Страница 4: ... 2 1 MECHANICAL CHART EMBROIDERY UNIT MECHANISM ...
Страница 6: ... 4 3 ELECTRONIC PARTS ARRANGEMENT CHART PC 8200 Model 985 4 CONTROL SYSTEM BLOCK DIAGRAM ...
Страница 16: ... 14 ...
Страница 18: ... 16 ...
Страница 20: ... 18 ...
Страница 23: ... 21 2 LEAD WIRE ARRANGEMENT PC 8200 Model 985 ...
Страница 53: ... 51 Main PC board Power supply unit ...
Страница 54: ... 52 LCD unit Other PC boards 985 ...
Страница 55: ... 53 PC8200 SG2000 H7070093 ...